{"title":"Improvement of Production Performance Using WAM & VALSAT Method in Liquid Soap Line","authors":"Andang Rikky Pradana, D. Ishak","doi":"10.1145/3468013.3468346","DOIUrl":null,"url":null,"abstract":"Overall Equipment Effectiveness performance in liquid soap line was 47.7% in 2020 where the OEE target in liquid soap line was 60%. This research will focus on eliminating waste to improve liquid soap line's OEE performance by analyzing waste using lean manufacturing tools. The methodology that used to solve this problem is by using WAM and VALSAT method combined with Six Sigma with DMAIC concept. In define phase, Value Stream Mapping was carried out to analyze the current condition in liquid soap line. Hereinafter, in measure and analyze phase, WAM and VALSAT was carried out to obtain the identification of waste and analyze the waste which causes low OEE in liquid soap line. This happens because of frequency of change over. Frequently changeover can lead low OEE due to production without output. The queuing of materials at the freight elevator is also the cause of low productivity. In the improvement phase, the author implement remapping product and production process redesign. After implementation, OEE increased from 47.7% to 55.5% and productivity increased from 96.7% to 97.9%. In control phase, the author suggests new total productive maintenance (TPM) as the control phase. EEM pillar was added to TPM to maintain performance monitoring process in liquid soap line.","PeriodicalId":129225,"journal":{"name":"Proceedings of the 4th Asia Pacific Conference on Research in Industrial and Systems Engineering","volume":"20 4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-05-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 4th Asia Pacific Conference on Research in Industrial and Systems Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/3468013.3468346","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Overall Equipment Effectiveness performance in liquid soap line was 47.7% in 2020 where the OEE target in liquid soap line was 60%. This research will focus on eliminating waste to improve liquid soap line's OEE performance by analyzing waste using lean manufacturing tools. The methodology that used to solve this problem is by using WAM and VALSAT method combined with Six Sigma with DMAIC concept. In define phase, Value Stream Mapping was carried out to analyze the current condition in liquid soap line. Hereinafter, in measure and analyze phase, WAM and VALSAT was carried out to obtain the identification of waste and analyze the waste which causes low OEE in liquid soap line. This happens because of frequency of change over. Frequently changeover can lead low OEE due to production without output. The queuing of materials at the freight elevator is also the cause of low productivity. In the improvement phase, the author implement remapping product and production process redesign. After implementation, OEE increased from 47.7% to 55.5% and productivity increased from 96.7% to 97.9%. In control phase, the author suggests new total productive maintenance (TPM) as the control phase. EEM pillar was added to TPM to maintain performance monitoring process in liquid soap line.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
用WAM和VALSAT方法改进液皂生产线的生产性能
2020年液皂线整体设备效率绩效为47.7%,其中液皂线OEE目标为60%。本研究将侧重于通过使用精益制造工具分析浪费来消除浪费以提高液体肥皂生产线的OEE性能。用于解决该问题的方法是使用WAM和VALSAT方法结合六西格玛与DMAIC概念。在确定阶段,运用价值流图对液皂生产线现状进行了分析。接下来,在测量与分析阶段,采用WAM和VALSAT对液皂生产线进行废弃物识别,并对造成OEE低的废弃物进行分析。这种情况的发生是因为更换的频率。频繁的转换会导致低OEE,因为生产没有产出。物料在货梯处排队也是造成生产率低下的原因。在改进阶段,作者实施了产品重新映射和生产工艺重新设计。实施后,OEE从47.7%提高到55.5%,生产率从96.7%提高到97.9%。在控制阶段,笔者建议采用新的全面生产维护(TPM)作为控制阶段。在TPM中增加EEM支柱,以维持液皂生产线的性能监控过程。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Simplification of the Calcine Transfer Control System Architecture for Ferronickel Projects in System Reliability Assessment The Role of Safety Leadership, Safety Objective, and Working Conditions in Safety Performance in Pharmaceutical Industries: A Conceptual Model Analysis of Loading Time Improvement on Finished Product Warehouse Using Lean Six Sigma and Discrete Event Simulation Developing a Sustainable Green Battery Swapping Industry Model: A Conceptual Framework The Impact of Employability Skills on Employers' Satisfaction: A Conceptual Model for Fresh Graduates of Engineering
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1