{"title":"Research on the Disturbance Law on the Cable Tunnel Induced by the Foundation Pit Construction of Pile Enclosing Structure","authors":"Zhiguo Duan, Qian Li, Kaixuan Zhang, Wenjiang Li","doi":"10.1109/ISTTCA53489.2021.9654664","DOIUrl":null,"url":null,"abstract":"Based on the engineering geological conditions of Shijiazhuang city, this paper analyzes the impact of foundation pit construction of pile enclosing structure on the horizontal deformation of the piles and ground settlement, and the deformation and structural internal force on the adjacent cable tunnel. Based on the above, the influence of the distance between foundation pit and tunnel on the deformation and safety of cable tunnels are also discussed. The research results show that the surface settlement on the side with tunnel is less than that without tunnel after the excavation of the foundation pit. The longitudinal stress of the cable tunnel structure is the main factor to the safety of the structure, and the maximum longitudinal tensile stress is located the tunnel wall foot far away from the foundation pit. There existing no-linear increasing relationship between the distance and the safety factor of the cable tunnel.","PeriodicalId":383266,"journal":{"name":"2021 4th International Symposium on Traffic Transportation and Civil Architecture (ISTTCA)","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 4th International Symposium on Traffic Transportation and Civil Architecture (ISTTCA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISTTCA53489.2021.9654664","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Based on the engineering geological conditions of Shijiazhuang city, this paper analyzes the impact of foundation pit construction of pile enclosing structure on the horizontal deformation of the piles and ground settlement, and the deformation and structural internal force on the adjacent cable tunnel. Based on the above, the influence of the distance between foundation pit and tunnel on the deformation and safety of cable tunnels are also discussed. The research results show that the surface settlement on the side with tunnel is less than that without tunnel after the excavation of the foundation pit. The longitudinal stress of the cable tunnel structure is the main factor to the safety of the structure, and the maximum longitudinal tensile stress is located the tunnel wall foot far away from the foundation pit. There existing no-linear increasing relationship between the distance and the safety factor of the cable tunnel.