THE IMPACT OF MATERIALS MANAGEMENT ON WASTE MINIMIZATION ON GHANAIAN CONSTRUCTION SITES IN THE VOLTA AND OTI REGIONS OF GHANA

Frank Bentum Mensah, Godfred Tsotorvor, Francis Kodwo Fordjour, Engr. Michael Tsorgali
{"title":"THE IMPACT OF MATERIALS MANAGEMENT ON WASTE MINIMIZATION ON GHANAIAN CONSTRUCTION SITES IN THE VOLTA AND OTI REGIONS OF GHANA","authors":"Frank Bentum Mensah, Godfred Tsotorvor, Francis Kodwo Fordjour, Engr. Michael Tsorgali","doi":"10.18535/ijsrm/v11i9.cs01","DOIUrl":null,"url":null,"abstract":"Minimizing of waste of materials on the construction sites contributes greatly to the general cost of the building as a result of improper supervision on sites towards storage, handling and usage of materials. However, the cost of providing building materials required to complete any construction project is greatly high perhaps amounting to 55%-60% of the tender figure. The research was aimed at ensuring effective and efficient storage and handling of construction materials at construction sites in Volta and Oti Regions to ensure waste minimization harnessed with the needed productivity, in relation to construction material management. To effectively carry out this project, a survey method through the use of techniques such as questionnaire, observation and interviews were undertaken to actually determine what took place on the construction site in terms of material management thus, storage and handling on construction sites. Population for the study covered 25 construction companies in both Volta and Oti Regions. Quota sampling technique was adopted to distribute questionnaires to 200 respondents and stratified random sampling techniques for selection of 50 operatives on sites visited. Furthermore, interviews were carried out for 15 interviewees and also observed 35 operatives. The method used to analyze the data was descriptive statistics in percentiles through the use of tables and charts. The results showed that, building materials are not properly kept, space allocated for material storage was not enough, poor mode of material transport to site and lack of keeping adequate records among few. It is hereby recommended that Contractors, Site Supervisors and Storekeepers in the construction industries needed to be given sufficient education on the technical knowhow of material storage and handling on site. Prompt delivery of material on sites, good documentations and transport of materials, coupled with proper supervision during batching and mixing of building materials, and finally, appropriate Site layout plans mostly showing location of building and also space allocated for material storage should be applied on most Ghanaian construction.","PeriodicalId":14221,"journal":{"name":"International Journal of scientific research and management","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-09-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of scientific research and management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18535/ijsrm/v11i9.cs01","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Minimizing of waste of materials on the construction sites contributes greatly to the general cost of the building as a result of improper supervision on sites towards storage, handling and usage of materials. However, the cost of providing building materials required to complete any construction project is greatly high perhaps amounting to 55%-60% of the tender figure. The research was aimed at ensuring effective and efficient storage and handling of construction materials at construction sites in Volta and Oti Regions to ensure waste minimization harnessed with the needed productivity, in relation to construction material management. To effectively carry out this project, a survey method through the use of techniques such as questionnaire, observation and interviews were undertaken to actually determine what took place on the construction site in terms of material management thus, storage and handling on construction sites. Population for the study covered 25 construction companies in both Volta and Oti Regions. Quota sampling technique was adopted to distribute questionnaires to 200 respondents and stratified random sampling techniques for selection of 50 operatives on sites visited. Furthermore, interviews were carried out for 15 interviewees and also observed 35 operatives. The method used to analyze the data was descriptive statistics in percentiles through the use of tables and charts. The results showed that, building materials are not properly kept, space allocated for material storage was not enough, poor mode of material transport to site and lack of keeping adequate records among few. It is hereby recommended that Contractors, Site Supervisors and Storekeepers in the construction industries needed to be given sufficient education on the technical knowhow of material storage and handling on site. Prompt delivery of material on sites, good documentations and transport of materials, coupled with proper supervision during batching and mixing of building materials, and finally, appropriate Site layout plans mostly showing location of building and also space allocated for material storage should be applied on most Ghanaian construction.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
在加纳volta和oti地区的加纳建筑工地,材料管理对尽量减少废物的影响
尽量减少建筑工地上的材料浪费,这对建筑的总体成本有很大的贡献,因为工地上对材料的储存、处理和使用的监管不当。然而,提供完成任何建设项目所需的建筑材料的成本非常高,可能达到招标数字的55%-60%。这项研究的目的是确保在Volta和Oti地区的建筑工地有效和高效地储存和处理建筑材料,以确保在建筑材料管理方面以所需的生产力最大限度地减少废物。为了有效地开展本项目,通过使用问卷调查,观察和访谈等技术进行了调查方法,以实际确定在建筑工地的材料管理,储存和处理方面发生了什么。研究对象包括Volta和Oti地区的25家建筑公司。采用定额抽样的方法,对200名调查对象发放问卷,并采用分层随机抽样的方法,在走访的现场抽取50名工作人员。此外,对15名受访者进行了访谈,并对35名操作人员进行了观察。数据分析采用的方法是通过表格和图表,以百分位数为单位的描述性统计。结果表明,建筑材料保存不合理,材料存储空间分配不足,材料运至现场的方式不佳,记录不充分。兹建议建筑行业的承包商、现场督导员和仓库管理员需要接受充分的关于现场材料储存和处理技术知识的教育。在大多数加纳建筑中,材料的及时交付,良好的文件和材料的运输,加上在建筑材料的配料和混合过程中进行适当的监督,最后是适当的场地布局图,主要显示建筑物的位置和分配给材料储存的空间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Service Quality and Performance Results through Customer Satisfaction at Small-Scale Hotels in Hanoi Area Management Skills of Department Heads in Relation to Employees Work Performance Technical Skills and Competence of Sports Officiating Officials: Basis for an Action Plan Technological innovations and their impact on higher economic skills and studies: realities and perspectives Compliance with the Code of Conduct and Teaching Performance
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1