PERENCANAAN PERSEDIAAN BAHAN BAKU KEDELAI MENGGUNAKAN METODE EOQ DI CV. PQR

Akhsani Nur Amalia
{"title":"PERENCANAAN PERSEDIAAN BAHAN BAKU KEDELAI MENGGUNAKAN METODE EOQ DI CV. PQR","authors":"Akhsani Nur Amalia","doi":"10.33373/profis.v11i1.5342","DOIUrl":null,"url":null,"abstract":"This study aims to determine the inventory planning of Soybean raw materials to produce Tempe products. The analysis was carried out based on the need for Soybean raw materials for the past 12 months. Raw material inventory planning is carried out using the Economic Order Quantity (EOQ) method. Where, the lead time is known with certainty and the arrival of Soybean raw materials at once. The results showed that the optimal order quantity of Soybeans in one order was 3117.31 kg. Soybean raw material ordering is carried out every seven days and eight hours. The minimum amount of Soybean inventory in the warehouse is 978.56 kg. Based on these points, the total cost of Soybean raw material inventory is Rp 176,287,365.","PeriodicalId":497932,"journal":{"name":"PROFISIENSI Jurnal Program Studi Teknik Industri","volume":"183 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"PROFISIENSI Jurnal Program Studi Teknik Industri","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33373/profis.v11i1.5342","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This study aims to determine the inventory planning of Soybean raw materials to produce Tempe products. The analysis was carried out based on the need for Soybean raw materials for the past 12 months. Raw material inventory planning is carried out using the Economic Order Quantity (EOQ) method. Where, the lead time is known with certainty and the arrival of Soybean raw materials at once. The results showed that the optimal order quantity of Soybeans in one order was 3117.31 kg. Soybean raw material ordering is carried out every seven days and eight hours. The minimum amount of Soybean inventory in the warehouse is 978.56 kg. Based on these points, the total cost of Soybean raw material inventory is Rp 176,287,365.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
使用在CV中使用EOQ方法策划大豆原料供应。PQR
本研究旨在确定大豆原料的库存计划,以生产Tempe产品。该分析是根据过去12个月对大豆原料的需求进行的。原材料库存计划采用经济订货量(EOQ)法进行。在那里,交货时间是确定的,大豆原料的到达是立即的。结果表明,单单大豆的最优订货量为3117.31 kg。大豆原料订货每7天8小时进行一次。仓库的大豆库存量最小为978.56公斤。基于这些点,大豆原料库存的总成本为176,287,365卢比。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
MENGEVALUASI PENYEBAB MATERIAL SHORTAGE DENGAN MENGGUNAKAN METODE ROOT CAUSE ANALYSIS (RCA) DI PT. RMS PERANCANGAN ULANG PEMANAS SHRINKABLE TUBE MENGGUNAKAN METODE QFD UNTUK MENINGKATKAN OUTPUT DI DEPARTEMEN PRODUKSI DI INDUSTRI MUKAKUNING PERBAIKAN PARAMETER UNTUK MENGATASI DEFECT BLUE HAZE PADA PROSES AUTO GLAZING DENGAN METODE TAGUCHI (PT. EXCELITAS TECHNOLOGIES BATAM) PENGENDALIAN PERSEDIAAN BAHAN BAKU SHUTTLECOCK GUNA MEMENUHI PERMINTAAN KONSUMEN (Studi Kasus : UD NUSA ) ANALISA KARAKTERISTIK ARANG BRIKET BATOK KELAPA TERHADAP VARIASI TEKANAN
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1