PENENTUAN WAKTU STANDAR PADA JASA LAUNDRY DRY AND CLEANING DI PT XYZ

Tri Novita Sari, Nur Arifiya, Anita Nurfida, R. Hermawan
{"title":"PENENTUAN WAKTU STANDAR PADA JASA LAUNDRY DRY AND CLEANING DI PT XYZ","authors":"Tri Novita Sari, Nur Arifiya, Anita Nurfida, R. Hermawan","doi":"10.33884/jrsi.v9i1.8148","DOIUrl":null,"url":null,"abstract":"Technological advances make it easier for every human being to carry out daily activities, one example of which is washing. PT XYZ is a company engaged in dry and cleaning laundry services which offers washing and ironing services for hotels. Punctuality of service is one of the keys to success at PT XYZ. The variation in the number of orders means that PT XYZ must set a standard time or standard time, so that timely service can be maintained. Measuring working time is an estimate of the time that will be used in a job. Work measurements are carried out directly using the stopwatch time study method to obtain standard time. Based on research, it was found that the standard time for the washing process until the distribution of laundry results to each hotel was 29 hours 17 seconds","PeriodicalId":32888,"journal":{"name":"Jurnal Rekayasa Sistem Industri","volume":"13 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-11-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Rekayasa Sistem Industri","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33884/jrsi.v9i1.8148","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Technological advances make it easier for every human being to carry out daily activities, one example of which is washing. PT XYZ is a company engaged in dry and cleaning laundry services which offers washing and ironing services for hotels. Punctuality of service is one of the keys to success at PT XYZ. The variation in the number of orders means that PT XYZ must set a standard time or standard time, so that timely service can be maintained. Measuring working time is an estimate of the time that will be used in a job. Work measurements are carried out directly using the stopwatch time study method to obtain standard time. Based on research, it was found that the standard time for the washing process until the distribution of laundry results to each hotel was 29 hours 17 seconds
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
XYZ 省洗衣干洗店的标准洗衣量
技术进步使每个人都能更轻松地进行日常活动,洗衣就是其中一例。PT XYZ 是一家从事干洗和清洗洗衣服务的公司,为酒店提供洗涤和熨烫服务。准时服务是 PT XYZ 成功的关键之一。订单数量的变化意味着 PT XYZ 必须设定一个标准时间或标准时间,以保证服务的及时性。测量工作时间是对一项工作所用时间的估计。工作测量直接使用秒表时间研究法来获得标准时间。根据研究发现,从洗衣过程到将洗衣结果分发到每家酒店的标准时间为 29 小时 17 秒
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
11
审稿时长
12 weeks
期刊最新文献
MENURUNKAN CACAT SHRINK PLASTIK PADA PRODUK BOTOL BEDAK MENGGUNAKAN METODE SIX SIGMA ANALISIS PERBANDINGAN METODE EOQ DAN METODE POQ DALAM PENGENDALIAN PERSEDIAAN BAHAN BAKU PADA PD. SINAR RAHAYU PENENTUAN WAKTU STANDAR PADA JASA LAUNDRY DRY AND CLEANING DI PT XYZ PERBANDINGAN KEAKURATAN PERAMALAN PRODUKSI OBAT DENGAN METODE WINTER DAN METODE DEKOMPOSISI PERANCANGAN SISTEM INFORMASI LABORATORIUM TEKNIK INDUSTRI UNIVERSITAS NEGERI GORONTALO
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1