Mely Mailasari, Monikka Nur Winnarto, Annida Purnamawati
{"title":"Penerapan Metode Waterfall dalam Pengembangan Aplikasi Schedule Maintenance Alat Produksi","authors":"Mely Mailasari, Monikka Nur Winnarto, Annida Purnamawati","doi":"10.29408/jit.v7i1.24080","DOIUrl":null,"url":null,"abstract":"PT. Shiroki Indonesia Cikarang is moving on the field of automotive spare parts manufacturing such as window regulator, seat recliner, sear track as well as floor lock. The activity uses a tool/machine as a support to produce spare parts that have good quality. With so many of these machines, then the company needs to do the maintenance and also the maintenance of the machine well. Scheduling of maintenance and maintenance of machinery production equipment still uses the record on board and requires information from the operator to be submitted to the technician. Therefore, it is necessary to create a web-based maintenance schedule application that can facilitate the performance of the staff in making the maintenance schedule of the production equipment more effective and efficient as well as the availability of reports from the maitenance. The research method used is the waterfall method which has five stages namely needs analysis, design, program code making, testing and support or maintenance. The schedule maintenance application was created using the PHP programming language using the CodeIgniter framework and the MySql database.","PeriodicalId":13567,"journal":{"name":"Infotek : Jurnal Informatika dan Teknologi","volume":"13 19","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-01-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Infotek : Jurnal Informatika dan Teknologi","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29408/jit.v7i1.24080","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
PT. Shiroki Indonesia Cikarang is moving on the field of automotive spare parts manufacturing such as window regulator, seat recliner, sear track as well as floor lock. The activity uses a tool/machine as a support to produce spare parts that have good quality. With so many of these machines, then the company needs to do the maintenance and also the maintenance of the machine well. Scheduling of maintenance and maintenance of machinery production equipment still uses the record on board and requires information from the operator to be submitted to the technician. Therefore, it is necessary to create a web-based maintenance schedule application that can facilitate the performance of the staff in making the maintenance schedule of the production equipment more effective and efficient as well as the availability of reports from the maitenance. The research method used is the waterfall method which has five stages namely needs analysis, design, program code making, testing and support or maintenance. The schedule maintenance application was created using the PHP programming language using the CodeIgniter framework and the MySql database.
PT.Shiroki Indonesia Cikarang 公司正在汽车零配件制造领域开展业务,如车窗调节器、座椅躺椅、刹车轨迹和地锁。该活动使用工具/机器作为支持,生产质量上乘的零配件。有了这么多这样的机器,公司就需要做好机器的维护和保养工作。机械生产设备的维护和保养计划仍然使用机上记录,需要操作员向技术人员提交信息。因此,有必要创建一个基于网络的维护计划应用程序,以便于工作人员更有效、高效地执行生产设备的维护计划,并提供维护报告。采用的研究方法是瀑布法,包括五个阶段,即需求分析、设计、程序代码制作、测试和支持或维护。计划维护应用程序是使用 PHP 编程语言、CodeIgniter 框架和 MySql 数据库创建的。