Energy saving during the partial heat load period by integrating a steam-heated absorption heat pump into the thermal scheme of a PT-60/70-130/13 steam turbine

Q3 Earth and Planetary Sciences Energetika Pub Date : 2024-02-23 DOI:10.6001/energetika.2023.69.1.3
Aleksandr Shubenko, M. Babak, Aleksandr Senetskyi, Yana Forkun
{"title":"Energy saving during the partial heat load period by integrating a steam-heated absorption heat pump into the thermal scheme of a PT-60/70-130/13 steam turbine","authors":"Aleksandr Shubenko, M. Babak, Aleksandr Senetskyi, Yana Forkun","doi":"10.6001/energetika.2023.69.1.3","DOIUrl":null,"url":null,"abstract":"\n \n \nThe task of determining the efficiency of operation of an absorption heat pump (AHP) with steam heating (COP conversion factor = 1.71) integrated into the thermal circuit of a PT-60/70-130/13 steam turbine that releases production steam and hot water during the partial heat load period (spring and autumn; also referred to as the inteheating period) is being solved in this paper. Variants of operation of the PT-60/70-130/13 with an integrated AHP with a capacity of ~17.25 MW in the partial heat load period were studied when steam with parameters of 1.296 MPa, 280°C was realised in the production selection of the adjustable turbine at flow rates of 20, 30, and 50 t/h with a variable heat load on hot water supply, which was determined by the return network water consumption task 1000–1400 t/h, while the ‘useful’ electrical power of the power complex was provided at ~30 MW. At electricity prices of 0.13 USD/(kWh) and standard fuel of 309 USD/t for Ukraine, the simple payback period of 17.25 MW AHP as part of the PT-60/70-130/13 steam turbine for the partial heat load period at a production load of 20–50 t/h of steam at the consumption of return network water of heat supply 1000–1200 t/h can decrease to two years. At the same time, during the partial heat load period, which lasts ~4404 hours in Ukraine, up to ~1.2% of fuel, up to 44% of technical water for feeding the circulation cooling system, and 0.4% of softened water for feeding are saved. A tangible environmental effect is achieved due to the reduction of harmful emissions – actual heat and hazardous gases – to the atmosphere: CO2 by 1118.7 tons, NOx by 5.87 t, thus saving ~41,000 of technical water. \n \n \n","PeriodicalId":35639,"journal":{"name":"Energetika","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-02-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Energetika","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.6001/energetika.2023.69.1.3","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
引用次数: 0

Abstract

The task of determining the efficiency of operation of an absorption heat pump (AHP) with steam heating (COP conversion factor = 1.71) integrated into the thermal circuit of a PT-60/70-130/13 steam turbine that releases production steam and hot water during the partial heat load period (spring and autumn; also referred to as the inteheating period) is being solved in this paper. Variants of operation of the PT-60/70-130/13 with an integrated AHP with a capacity of ~17.25 MW in the partial heat load period were studied when steam with parameters of 1.296 MPa, 280°C was realised in the production selection of the adjustable turbine at flow rates of 20, 30, and 50 t/h with a variable heat load on hot water supply, which was determined by the return network water consumption task 1000–1400 t/h, while the ‘useful’ electrical power of the power complex was provided at ~30 MW. At electricity prices of 0.13 USD/(kWh) and standard fuel of 309 USD/t for Ukraine, the simple payback period of 17.25 MW AHP as part of the PT-60/70-130/13 steam turbine for the partial heat load period at a production load of 20–50 t/h of steam at the consumption of return network water of heat supply 1000–1200 t/h can decrease to two years. At the same time, during the partial heat load period, which lasts ~4404 hours in Ukraine, up to ~1.2% of fuel, up to 44% of technical water for feeding the circulation cooling system, and 0.4% of softened water for feeding are saved. A tangible environmental effect is achieved due to the reduction of harmful emissions – actual heat and hazardous gases – to the atmosphere: CO2 by 1118.7 tons, NOx by 5.87 t, thus saving ~41,000 of technical water.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
将蒸汽加热吸收式热泵纳入 PT-60/70-130/13 型蒸汽轮机的热力方案,在部分热负荷期间节约能源
本文的任务是确定在 PT-60/70-130/13 型汽轮机的热力回路中集成的蒸汽加热吸收式热泵 (AHP) 的运行效率(COP 换算系数 = 1.71),该热泵在部分热负荷期(春季和秋季,也称为保温期)释放生产蒸汽和热水。当参数为 1.296 兆帕、280 摄氏度的蒸汽在流量为 20、30 和 50 吨/小时的可调式汽轮机生产选择中实现时,研究了 PT-60/70-130/13 型汽轮机在部分热负荷期的各种运行方式,该汽轮机集成了功率为约 17.25 兆瓦的自动水力压 缩机,热水供应的热负荷可变,由 1000-1400 吨/小时的回水网耗水量决定,同时电力综合体的 "有用 "电功率为约 30 兆瓦。按照乌克兰 0.13 美元/(千瓦时)的电价和 309 美元/吨的标准燃料价格计算,17.25 兆瓦 AHP 作为 PT-60/70-130/13 型汽轮机的一部分,在部分热负荷期间,蒸汽生产负荷为 20-50 吨/小时,供热回水消耗量为 1000-1200 吨/小时,其简单投资回收期可缩短至两年。同时,在乌克兰持续约 4404 小时的部分热负荷期间,可节省约 1.2% 的燃料、44% 的循环冷却系统给水和 0.4% 的给水软化水。由于减少了向大气排放的有害气体(实际热量和有害气体),因此取得了显著的环保效果:二氧化碳减少了 1118.7 吨,氮氧化物减少了 5.87 吨,从而节约了约 41,000 吨技术用水。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Energetika
Energetika Energy-Energy Engineering and Power Technology
CiteScore
2.10
自引率
0.00%
发文量
0
期刊介绍: The journal publishes original scientific, review and problem papers in the following fields: power engineering economics, modelling of energy systems, their management and optimi­zation, target systems, environmental impacts of power engi­neering objects, nuclear energetics, its safety, radioactive waste disposal, renewable power sources, power engineering metro­logy, thermal physics, aerohydrodynamics, plasma technologies, combustion processes, hydrogen energetics, material studies and technologies, hydrology, hydroenergetics. All papers are re­viewed. Information is presented on the defended theses, vari­ous conferences, reviews, etc.
期刊最新文献
Analysis of the Wider Potential for Heat Pump and Geothermal Energy Integration in Traditional Systems and Grids Energy saving during the partial heat load period by integrating a steam-heated absorption heat pump into the thermal scheme of a PT-60/70-130/13 steam turbine Policies and energy consumption-driven trends facilitating development of the value chain for wind energy component manufacturing in Lithuania Design and optimization of automatic solar irrigation-based PLC Carbon burnout from the char of a single cylindrical pellet
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1