Identification and Ranking of Factors Affecting the Delay Risk of High-Rise Construction Projects Using AHP and VIKOR Methods

Mehran Vahedi Nikbakht, M. Gheibi, Hassan Montazeri, Reza Yeganeh Khaksar, R. Moezzi, Amir Vadiee
{"title":"Identification and Ranking of Factors Affecting the Delay Risk of High-Rise Construction Projects Using AHP and VIKOR Methods","authors":"Mehran Vahedi Nikbakht, M. Gheibi, Hassan Montazeri, Reza Yeganeh Khaksar, R. Moezzi, Amir Vadiee","doi":"10.3390/infrastructures9020024","DOIUrl":null,"url":null,"abstract":"Construction projects, especially those for commercial purposes, require thorough planning and control to ensure success within predetermined budgets and timelines. This research, conducted in Mashhad, Iran, employs the analytic hierarchy process (AHP) and VIKOR methods to identify and rank factors influencing delays in high-rise projects. The study, based on a sample of 40 projects, emphasizes the comprehensive nature of our research method. The scale for features in project selection includes societal importance (with different applications including cultural hubs, affordable housing initiatives, and urban renewal for social equity), size (less and more than 20 units in residential projects), and diversity (mixed-use development, inclusive infrastructure, and cultural and recreational spaces), contributing to a comprehensive analysis of construction delays. Expert project managers and engineers provided insights through two questionnaires, and their responses underwent thorough analysis. Our findings not only underscore the significance of factors contributing to project success but also rank their impact on the likelihood of delays. The study reveals that the negative effects of these factors on cost, time, and project quality vary. Time emerges as the most influential parameter, with approximately six times more impact on cost and nine times more on quality. Contractor financial weakness, delays in allocating financial and credit resources, insufficient project resource allocation, contractor technical and executive weakness, and a lack of proper implementation and project control are identified as the most important factors contributing to delays.","PeriodicalId":502683,"journal":{"name":"Infrastructures","volume":"545 ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-01-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Infrastructures","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3390/infrastructures9020024","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Construction projects, especially those for commercial purposes, require thorough planning and control to ensure success within predetermined budgets and timelines. This research, conducted in Mashhad, Iran, employs the analytic hierarchy process (AHP) and VIKOR methods to identify and rank factors influencing delays in high-rise projects. The study, based on a sample of 40 projects, emphasizes the comprehensive nature of our research method. The scale for features in project selection includes societal importance (with different applications including cultural hubs, affordable housing initiatives, and urban renewal for social equity), size (less and more than 20 units in residential projects), and diversity (mixed-use development, inclusive infrastructure, and cultural and recreational spaces), contributing to a comprehensive analysis of construction delays. Expert project managers and engineers provided insights through two questionnaires, and their responses underwent thorough analysis. Our findings not only underscore the significance of factors contributing to project success but also rank their impact on the likelihood of delays. The study reveals that the negative effects of these factors on cost, time, and project quality vary. Time emerges as the most influential parameter, with approximately six times more impact on cost and nine times more on quality. Contractor financial weakness, delays in allocating financial and credit resources, insufficient project resource allocation, contractor technical and executive weakness, and a lack of proper implementation and project control are identified as the most important factors contributing to delays.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
使用 AHP 和 VIKOR 方法识别影响高层建筑项目延误风险的因素并进行排序
建筑项目,尤其是商业项目,需要周密的规划和控制,以确保在预定的预算和时间范围内取得成功。本研究在伊朗马什哈德进行,采用了层次分析法(AHP)和 VIKOR 方法来识别和排序影响高层建筑项目延误的因素。该研究以 40 个项目为样本,强调了我们研究方法的全面性。项目选择的特征尺度包括社会重要性(不同的应用包括文化中心、经济适用房倡议和城市更新促进社会公平)、规模(住宅项目中少于和多于 20 个单元)和多样性(混合用途开发、包容性基础设施和文化娱乐空间),有助于对施工延误进行全面分析。项目经理和工程师专家通过两份调查问卷提供了真知灼见,并对他们的回答进行了深入分析。我们的研究结果不仅强调了有助于项目成功的因素的重要性,还对这些因素对延误可能性的影响进行了排序。研究显示,这些因素对成本、时间和项目质量的负面影响各不相同。时间是影响最大的参数,对成本的影响约为成本的 6 倍,对质量的影响约为质量的 9 倍。承包商财力薄弱、财政和信贷资源分配延迟、项目资源分配不足、承包商技术和执行力薄弱以及缺乏适当的实施和项目控制被认为是造成延误的最重要因素。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Evaluation of Pigment-Modified Clear Binders and Asphalts: An Approach towards Sustainable, Heat Harvesting, and Non-Black Pavements Traffic Flow Optimization at Toll Plaza Using Proactive Deep Learning Strategies Track Deterioration Model—State of the Art and Research Potentials Microstructural and Residual Properties of Self-Compacting Concrete Containing Waste Copper Slag as Fine Aggregate Exposed to Ambient and Elevated Temperatures Building Information Modeling/Building Energy Simulation Integration Based on Quantitative and Interpretative Interoperability Analysis
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1