A case history of monitoring a wide pile group Part I: geology, single pile analysis and testing, and monitoring data

IF 2 4区 工程技术 Q3 ENGINEERING, GEOLOGICAL Proceedings of the Institution of Civil Engineers-Geotechnical Engineering Pub Date : 2024-04-29 DOI:10.1680/jgeen.23.00001
Stephen Buttling, Bengt H. Fellenius, Naruedol Pinijpol
{"title":"A case history of monitoring a wide pile group Part I: geology, single pile analysis and testing, and monitoring data","authors":"Stephen Buttling, Bengt H. Fellenius, Naruedol Pinijpol","doi":"10.1680/jgeen.23.00001","DOIUrl":null,"url":null,"abstract":"This is the first of two papers on a wide pile group. In this part, the geology and a geotechnical model of the site are presented, along with the design of a single pile, analysis of a static loading test, and some dynamic tests. The response of the piled foundations comprising 399 bored piles supporting three 70-storey towers on a common mat was monitored over nine years. The records consist of results of a static loading test to 3.5 times the sustained load, dynamic tests of four piles, and monitoring the development of load in 15 piles and settlement of 40 points during construction and nine years following. At end of construction, the perimeter piles received more load from the towers than did the interior piles and the mat settled on average 90 mm. At the end of the monitoring period, due to the general subsidence, the average settlement of the mat had increased by 50 mm. Most of the settlement is considered to originate from the compression of the soil layers below the pile toe level. A subsequent paper will present the analysis and design of the wide pile group, and the numerical analysis of the static loading test on a single pile and of the wide pile group.","PeriodicalId":54572,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Geotechnical Engineering","volume":"82 1","pages":""},"PeriodicalIF":2.0000,"publicationDate":"2024-04-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Geotechnical Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1680/jgeen.23.00001","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, GEOLOGICAL","Score":null,"Total":0}
引用次数: 0

Abstract

This is the first of two papers on a wide pile group. In this part, the geology and a geotechnical model of the site are presented, along with the design of a single pile, analysis of a static loading test, and some dynamic tests. The response of the piled foundations comprising 399 bored piles supporting three 70-storey towers on a common mat was monitored over nine years. The records consist of results of a static loading test to 3.5 times the sustained load, dynamic tests of four piles, and monitoring the development of load in 15 piles and settlement of 40 points during construction and nine years following. At end of construction, the perimeter piles received more load from the towers than did the interior piles and the mat settled on average 90 mm. At the end of the monitoring period, due to the general subsidence, the average settlement of the mat had increased by 50 mm. Most of the settlement is considered to originate from the compression of the soil layers below the pile toe level. A subsequent paper will present the analysis and design of the wide pile group, and the numerical analysis of the static loading test on a single pile and of the wide pile group.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
宽桩群监测案例 I 部分:地质、单桩分析和测试以及监测数据
本文是关于一个宽桩群的两篇论文中的第一篇。在这一部分中,介绍了场地的地质情况和岩土工程模型,以及单桩的设计、静载试验分析和一些动态试验。对由 399 根钻孔灌注桩组成的桩基的响应进行了长达九年的监测,这些桩基在一个共同的垫层上支撑着三座 70 层的塔楼。记录包括 3.5 倍持续荷载的静态加载试验结果、四根桩的动态试验结果,以及在施工期间及其后九年对 15 根桩的荷载发展和 40 个点的沉降进行的监测。施工结束时,周边桩基承受的塔楼荷载大于内部桩基,垫层平均沉降 90 毫米。在监测期结束时,由于总体下沉,垫层的平均沉降量增加了 50 毫米。沉降的大部分原因被认为是桩趾水平以下土层的压缩。后续论文将介绍宽桩群的分析和设计,以及单桩和宽桩群静力加载试验的数值分析。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
4.40
自引率
4.50%
发文量
68
审稿时长
3 months
期刊介绍: Geotechnical Engineering provides a forum for the publication of high quality, topical and relevant technical papers covering all aspects of geotechnical research, design, construction and performance. The journal aims to be of interest to those civil, structural or geotechnical engineering practitioners wishing to develop a greater understanding of the influence of geotechnics on the built environment.
期刊最新文献
A case history of monitoring a wide pile group Part I: geology, single pile analysis and testing, and monitoring data Torsional vibration of a tapered pile considering circumferential support of surrounding soil Applicability of construction dewatering techniques for randomly fractured rock Sensitivity investigation of drilling efficiency to operational parameters of a drifter Hyperbolic load-displacement analysis of helical and expanded piles: database approach
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1