Power smoothing by kite tether force control for megawatt-scale airborne wind energy systems

Jis Hummel, Tsc Pollack, D. Eijkelhof, E. Van Kampen, R. Schmehl
{"title":"Power smoothing by kite tether force control for megawatt-scale airborne wind energy systems","authors":"Jis Hummel, Tsc Pollack, D. Eijkelhof, E. Van Kampen, R. Schmehl","doi":"10.1088/1742-6596/2767/7/072019","DOIUrl":null,"url":null,"abstract":"Airborne wind energy is an emerging technology that uses tethered flying devices to capture stronger and more steady winds at higher altitudes. Compared to smaller systems, megawatt-scale systems are substantially affected by gravity during flight operation, resulting in power fluctuations. MegAWES, a 3 MW reference model, experiences power fluctuations between -5.8 MW and +20.5 MW every 12.5 seconds during the traction phase when using its baseline controller at a wind speed of 22 m/s. The baseline controller does not have a power limit, leading to high peak power, and aims to keep the tether force constant, causing it to consume power when the kite is flying upwards. In this paper, we implement an optimal torque controller in the MegAWES framework and show that this eliminates the power consumption during the traction phase. Furthermore, we propose a kite tether force controller that allows setting a power limit when combined with the 2-phase reeling strategy, which decreases the peak power. Our new architecture reduces the power output range by 75% to between +3.7 MW and +9.4 MW in strong wind conditions.","PeriodicalId":16821,"journal":{"name":"Journal of Physics: Conference Series","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2024-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Physics: Conference Series","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1088/1742-6596/2767/7/072019","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Airborne wind energy is an emerging technology that uses tethered flying devices to capture stronger and more steady winds at higher altitudes. Compared to smaller systems, megawatt-scale systems are substantially affected by gravity during flight operation, resulting in power fluctuations. MegAWES, a 3 MW reference model, experiences power fluctuations between -5.8 MW and +20.5 MW every 12.5 seconds during the traction phase when using its baseline controller at a wind speed of 22 m/s. The baseline controller does not have a power limit, leading to high peak power, and aims to keep the tether force constant, causing it to consume power when the kite is flying upwards. In this paper, we implement an optimal torque controller in the MegAWES framework and show that this eliminates the power consumption during the traction phase. Furthermore, we propose a kite tether force controller that allows setting a power limit when combined with the 2-phase reeling strategy, which decreases the peak power. Our new architecture reduces the power output range by 75% to between +3.7 MW and +9.4 MW in strong wind conditions.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
兆瓦级机载风能系统的风筝系绳力控制功率平滑化
机载风能是一种新兴技术,利用系留飞行装置在高空捕捉更强劲、更稳定的风。与较小的系统相比,兆瓦级系统在飞行过程中会受到重力的很大影响,从而导致功率波动。3 兆瓦参考模型 MegAWES 在风速为 22 米/秒时使用基线控制器,在牵引阶段每 12.5 秒就会出现 -5.8 兆瓦到 +20.5 兆瓦之间的功率波动。基线控制器没有功率限制,导致峰值功率很高,并且旨在保持系绳力恒定,导致风筝向上飞行时消耗功率。在本文中,我们在 MegAWES 框架中实现了最优扭矩控制器,并证明该控制器消除了牵引阶段的功耗。此外,我们还提出了一种风筝系绳力控制器,当与两阶段收线策略相结合时,可以设置功率限制,从而降低峰值功率。在强风条件下,我们的新架构将功率输出范围缩小了 75%,达到 +3.7 MW 至 +9.4 MW。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
1.20
自引率
0.00%
发文量
0
期刊最新文献
Research and design of low-noise cooling fan for fuel cell vehicle Enhanced heat transfer technology for solar air heaters Comparison of thermo-catalytic and photo-assisted thermo-catalytic conversion of glucose to HMF with Cr-MOFs@ZrO2 Mechanical integrity analysis of caprock during the CO2 injection phase Numerical study of film cooling at the outlet of gas turbine exhaust
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1