Drought mitigation operation of water conservancy projects under severe droughts

IF 2.7 4区 环境科学与生态学 Q2 Environmental Science Hydrology Research Pub Date : 2024-07-05 DOI:10.2166/nh.2024.034
Wei Ding, Aimei Bao, Jie Lin, Chengxin Luo, Hui Cao, Dongjie Zhang
{"title":"Drought mitigation operation of water conservancy projects under severe droughts","authors":"Wei Ding, Aimei Bao, Jie Lin, Chengxin Luo, Hui Cao, Dongjie Zhang","doi":"10.2166/nh.2024.034","DOIUrl":null,"url":null,"abstract":"\n \n Severe droughts typically last for extended periods and result in substantial water shortages, posing challenges for water conservancy projects. This study proposed a framework for coordinating drought mitigation operations across projects of various scales. First, the regulation and drought mitigation capacities of each project were analyzed, and thus critical reservoirs was identified. Subsequently, a joint regulation model for water supply, prioritizing projects based on their regulatory capacity from weak to strong, was established. An optimization model is then developed to determine the drought-limited levels for critical reservoirs, aiming to minimize water shortages. This model facilitates temporal coordination of water resources to prevent severe water shortages with frequent mild water shortages. Results in the Chuxionglucheng District of Chuxiong, Yunnan Province, during the severe drought period from 2009 to 2013, demonstrates significant reductions in water shortage. Specifically, the maximum shortage ratio decreased from 59 to 45% for agriculture and from 52 to 8% for industry. Moreover, emergency measures for drought mitigation were compared and recommend for regions with weak projects regulation. Overall, this framework offers a systematic approach to enhancing drought resilience across diverse water conservancy projects in severe drought conditions.","PeriodicalId":55040,"journal":{"name":"Hydrology Research","volume":null,"pages":null},"PeriodicalIF":2.7000,"publicationDate":"2024-07-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Hydrology Research","FirstCategoryId":"93","ListUrlMain":"https://doi.org/10.2166/nh.2024.034","RegionNum":4,"RegionCategory":"环境科学与生态学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Environmental Science","Score":null,"Total":0}
引用次数: 0

Abstract

Severe droughts typically last for extended periods and result in substantial water shortages, posing challenges for water conservancy projects. This study proposed a framework for coordinating drought mitigation operations across projects of various scales. First, the regulation and drought mitigation capacities of each project were analyzed, and thus critical reservoirs was identified. Subsequently, a joint regulation model for water supply, prioritizing projects based on their regulatory capacity from weak to strong, was established. An optimization model is then developed to determine the drought-limited levels for critical reservoirs, aiming to minimize water shortages. This model facilitates temporal coordination of water resources to prevent severe water shortages with frequent mild water shortages. Results in the Chuxionglucheng District of Chuxiong, Yunnan Province, during the severe drought period from 2009 to 2013, demonstrates significant reductions in water shortage. Specifically, the maximum shortage ratio decreased from 59 to 45% for agriculture and from 52 to 8% for industry. Moreover, emergency measures for drought mitigation were compared and recommend for regions with weak projects regulation. Overall, this framework offers a systematic approach to enhancing drought resilience across diverse water conservancy projects in severe drought conditions.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
严重干旱下的水利工程抗旱运行
严重干旱通常会持续很长时间,并导致严重缺水,给水利工程带来挑战。本研究提出了一个协调不同规模工程抗旱行动的框架。首先,分析了各工程的调节和抗旱能力,从而确定了关键水库。随后,建立了供水联合调节模型,根据调节能力从弱到强排列项目的优先次序。然后建立了一个优化模型,以确定关键水库的干旱限制水位,从而最大限度地减少水资源短缺。该模型有助于水资源的时间协调,以防止严重缺水和频繁的轻度缺水。云南省楚雄州楚雄潞城区在 2009 年至 2013 年严重干旱期间的研究结果表明,缺水率显著降低。具体而言,农业最大缺水率从 59%降至 45%,工业最大缺水率从 52%降至 8%。此外,还对项目监管薄弱地区的抗旱应急措施进行了比较和建议。总之,该框架为在严重干旱条件下提高不同水利工程的抗旱能力提供了系统方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Hydrology Research
Hydrology Research Environmental Science-Water Science and Technology
CiteScore
5.30
自引率
7.40%
发文量
70
审稿时长
17 weeks
期刊介绍: Hydrology Research provides international coverage on all aspects of hydrology in its widest sense, and welcomes the submission of papers from across the subject. While emphasis is placed on studies of the hydrological cycle, the Journal also covers the physics and chemistry of water. Hydrology Research is intended to be a link between basic hydrological research and the practical application of scientific results within the broad field of water management.
期刊最新文献
Prediction of flash flood peak discharge in hilly areas with ungauged basins based on machine learning Effects of tributary inflows on unsteady flow hysteresis and hydrodynamics in the mainstream Drought mitigation operation of water conservancy projects under severe droughts Water quality level estimation using IoT sensors and probabilistic machine learning model Design storm parameterisation for urban drainage studies derived from regional rainfall datasets: A case study in the Spanish Mediterranean region
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1