Analisis Faktor Keterlambatan Penyelesaian Proyek Peningkatan Jalan Ruas Ambemali (Studi Kasus Jln. Belalo/Lasolo – Jln. Arisunggu)

P. Sakti, Junarto Junarto
{"title":"Analisis Faktor Keterlambatan Penyelesaian Proyek Peningkatan Jalan Ruas Ambemali (Studi Kasus Jln. Belalo/Lasolo – Jln. Arisunggu)","authors":"P. Sakti, Junarto Junarto","doi":"10.31004/jutin.v7i3.29943","DOIUrl":null,"url":null,"abstract":"Delays in implementing construction projects can have negative impacts on contractors and owners. Contractors whose construction projects are late will experience losses in terms of time and costs, because the profits expected by the contractor will be reduced, or even no profits at all. Respondent characteristics based on the questionnaire were classified into several categories, work experience, latest education, company category and field of work in the company. Factors causing delays in work on the Ambemali Road Improvement construction project, Jln. Belalo – Jln. Lasolo, Wawotobi District, Konawe Regency, according to the perception of PPK/PPTK, Directors, Consultants and Service Providers (Contractors) of PT Kendari Baruga Pratama, is caused by Labor Factors with indicators of contractor negligence, Equipment Factors with indicators of Equipment Damage, material factors with this being the lack of material available around the work site , financial factors indicating limited contractor funds, managerial factors namely inappropriate implementation methods, design suitability factors indicating design changes and other factors namely material sources far from the work location.","PeriodicalId":17759,"journal":{"name":"Jurnal Teknik Industri Terintegrasi","volume":"62 4","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-07-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknik Industri Terintegrasi","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31004/jutin.v7i3.29943","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Delays in implementing construction projects can have negative impacts on contractors and owners. Contractors whose construction projects are late will experience losses in terms of time and costs, because the profits expected by the contractor will be reduced, or even no profits at all. Respondent characteristics based on the questionnaire were classified into several categories, work experience, latest education, company category and field of work in the company. Factors causing delays in work on the Ambemali Road Improvement construction project, Jln. Belalo – Jln. Lasolo, Wawotobi District, Konawe Regency, according to the perception of PPK/PPTK, Directors, Consultants and Service Providers (Contractors) of PT Kendari Baruga Pratama, is caused by Labor Factors with indicators of contractor negligence, Equipment Factors with indicators of Equipment Damage, material factors with this being the lack of material available around the work site , financial factors indicating limited contractor funds, managerial factors namely inappropriate implementation methods, design suitability factors indicating design changes and other factors namely material sources far from the work location.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
安贝马里公路改善项目竣工延迟因素分析(Jln.)
建筑项目的延迟实施会对承包商和业主造成负面影响。建筑项目延误的承包商将在时间和成本方面蒙受损失,因为承包商预期的利润将减少,甚至完全没有利润。根据问卷调查,受访者的特征被分为几类:工作经验、最新学历、公司类别和在公司的工作领域。造成 Jln.Belalo - Jln.根据 PT Kendari Baruga Pratama 公司的 PPK/PPTK、董事、顾问和服务提供商(承包商)的看法,造成工程延误的因素包括:劳动力因素(承包商疏忽)、设备因素(设备损坏)、材料因素(工地周围缺乏材料)、财务因素(承包商资金有限)、管理因素(实施方法不当)、设计适宜性因素(设计变更)以及其他因素(远离工地的材料来源)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Analisis SWOT dan Technique For Order Preference by Similarity to Ideal Solution (TOPSIS) untuk Strategi Pengembangan Usaha di Gapit 24 Klasifikasi Menggunakan Metode Random Forest untuk Awal Deteksi Diabetes Melitus Tipe 2 Rancang Ulang Alat Penghalus Rebana untuk Meminimumkan Waktu Proses Penghalusan Analisis Faktor Keterlambatan Penyelesaian Proyek Peningkatan Jalan Ruas Ambemali (Studi Kasus Jln. Belalo/Lasolo – Jln. Arisunggu) Perancangan Penyiraman Kandang Berbasis Arduino Uno Guna Menjaga Stabulitas Suhu dan Kelembapan
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1