{"title":"Studi Perencanaan Sarana Air Bersih Melalui Sistem Perpipaan di Desa Marmoyo, Kecamatan Kabuh, Kabupaten Jombang","authors":"A. Hartadi, Faradlillah Saves","doi":"10.31004/jutin.v7i3.30874","DOIUrl":null,"url":null,"abstract":"The availability of clean water is mandatory and applies to all places. Marmoyo Village is part of Kabuh District, Jombang Regency which relies on shallow wells to meet its clean water needs. To find out the projected water demands of the population is a population calculation projection. To find out the planning average of clean water demands by pumping tests to find out the maximum discharge of deep wells and the optimum discharge of pumping as well as the planned piping scheme using the Epanet 2.2 program to find out the flow rate, velocity, pressure and headloss. The research results showed that the average discharge requirement in 2044 was 1,163 l/second for a population in 2044 of 1,395 people. Meanwhile, the maximum discharge for deep wells obtained through pumping tests was 1.64 l/second. The piping system uses a double system and a branch system with 2\" (50 mm) diameter PVC pipes where the piping system plan will be carried out at RT. 002, RW 007 Marmoyo Village, Kabuh District, Jombang Regency. In the simulation with Epanet 2.2 it is known that the highest velocity are 0.04 m/sec while the highest pressure are 19.86 m. ","PeriodicalId":17759,"journal":{"name":"Jurnal Teknik Industri Terintegrasi","volume":"49 S238","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-07-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknik Industri Terintegrasi","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31004/jutin.v7i3.30874","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The availability of clean water is mandatory and applies to all places. Marmoyo Village is part of Kabuh District, Jombang Regency which relies on shallow wells to meet its clean water needs. To find out the projected water demands of the population is a population calculation projection. To find out the planning average of clean water demands by pumping tests to find out the maximum discharge of deep wells and the optimum discharge of pumping as well as the planned piping scheme using the Epanet 2.2 program to find out the flow rate, velocity, pressure and headloss. The research results showed that the average discharge requirement in 2044 was 1,163 l/second for a population in 2044 of 1,395 people. Meanwhile, the maximum discharge for deep wells obtained through pumping tests was 1.64 l/second. The piping system uses a double system and a branch system with 2" (50 mm) diameter PVC pipes where the piping system plan will be carried out at RT. 002, RW 007 Marmoyo Village, Kabuh District, Jombang Regency. In the simulation with Epanet 2.2 it is known that the highest velocity are 0.04 m/sec while the highest pressure are 19.86 m. 
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
琼邦县卡布分区马尔莫约村通过管道系统提供清洁水设施的规划研究
清洁水的供应是强制性的,适用于所有地方。马尔莫约村隶属于磅邦县卡布区,该区依靠浅井满足清洁用水需求。为了解人口的预计用水需求,需要进行人口计算预测。通过抽水测试找出深井的最大排水量和抽水的最佳排水量,并使用 Epanet 2.2 程序找出流量、流速、压力和水头损失,从而找出清洁水需求的规划平均值。研究结果表明,在 2044 年人口为 1 395 人的情况下,2044 年的平均排水量要求为 1 163 升/秒。同时,通过抽水试验获得的深井最大排水量为 1.64 升/秒。管道系统采用双系统和分支系统,使用直径为 2 英寸(50 毫米)的 PVC 管,管道系统规划将在 RT.002, RW 007 Marmoyo Village, Kabuh District, Jombang Regency。在使用 Epanet 2.2 进行模拟时,最高流速为 0.04 米/秒,最高压力为 19.86 米/秒。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Analisis SWOT dan Technique For Order Preference by Similarity to Ideal Solution (TOPSIS) untuk Strategi Pengembangan Usaha di Gapit 24 Klasifikasi Menggunakan Metode Random Forest untuk Awal Deteksi Diabetes Melitus Tipe 2 Rancang Ulang Alat Penghalus Rebana untuk Meminimumkan Waktu Proses Penghalusan Analisis Faktor Keterlambatan Penyelesaian Proyek Peningkatan Jalan Ruas Ambemali (Studi Kasus Jln. Belalo/Lasolo – Jln. Arisunggu) Perancangan Penyiraman Kandang Berbasis Arduino Uno Guna Menjaga Stabulitas Suhu dan Kelembapan
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1