Kajian Peranan Konsultan Manajemen Konstruksi pada Proyek Konstruksi di Makassar

Burhamsyah Amin, Hanafi Ashad, Husni Maricar
{"title":"Kajian Peranan Konsultan Manajemen Konstruksi pada Proyek Konstruksi di Makassar","authors":"Burhamsyah Amin, Hanafi Ashad, Husni Maricar","doi":"10.31004/jutin.v7i3.30751","DOIUrl":null,"url":null,"abstract":"Implementation of work on construction projects generally involves the collaboration of several parties, namely the work owner, contractors and consultants. There are several consultants involved in construction projects, one of which is Construction Management Consultants (MK). The success of the role of an MK consultant can be measured through achievements in terms of cost, time and quality of work. Research to examine the role of MK consultants at the construction project implementation stage and examine the influence of the role of MK consultants on the timeliness of work on the Rehabilitation project for Buildings B, C, D, Makassar Unhas Hospital. Quantitative research method with multiple linear regression analysis techniques. The results of the research are that the role of construction management consultants at the implementation stage of construction projects is carried out well based on the highest positive response (Agree), namely the capability of MK consultants in taking corrective action on deviations between planning and implementation (X4) reaching a value of 68.35% and the role of project management consultants positive influence or significance even though the correlation value is low on the progress of project work, the highest correlation value is on the variable (X2) consistency of MK consultant personnel in implementing existing plans with a value of 0.348 and the lowest correlation value on variable (X5) capability of MK consultants in management project costs to the progress of project work with a value of 0.088. ","PeriodicalId":17759,"journal":{"name":"Jurnal Teknik Industri Terintegrasi","volume":"100 10","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2024-07-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknik Industri Terintegrasi","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31004/jutin.v7i3.30751","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Implementation of work on construction projects generally involves the collaboration of several parties, namely the work owner, contractors and consultants. There are several consultants involved in construction projects, one of which is Construction Management Consultants (MK). The success of the role of an MK consultant can be measured through achievements in terms of cost, time and quality of work. Research to examine the role of MK consultants at the construction project implementation stage and examine the influence of the role of MK consultants on the timeliness of work on the Rehabilitation project for Buildings B, C, D, Makassar Unhas Hospital. Quantitative research method with multiple linear regression analysis techniques. The results of the research are that the role of construction management consultants at the implementation stage of construction projects is carried out well based on the highest positive response (Agree), namely the capability of MK consultants in taking corrective action on deviations between planning and implementation (X4) reaching a value of 68.35% and the role of project management consultants positive influence or significance even though the correlation value is low on the progress of project work, the highest correlation value is on the variable (X2) consistency of MK consultant personnel in implementing existing plans with a value of 0.348 and the lowest correlation value on variable (X5) capability of MK consultants in management project costs to the progress of project work with a value of 0.088. 
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
研究建筑管理顾问在望加锡建筑项目中的作用
建筑项目的实施工作通常涉及到几个方面的合作,即工程业主、承包商和顾问。有几家咨询公司参与了建筑项目,其中之一就是施工管理咨询公司(MK)。MK 顾问的作用是否成功,可以通过成本、时间和工程质量方面的成就来衡量。本研究旨在考察 MK 咨询公司在建筑项目实施阶段的作用,并考察 MK 咨询公司的作用对马卡萨乌哈斯医院 B、C、D 号楼修复项目工作及时性的影响。采用多元线性回归分析技术的定量研究方法。研究结果表明,建筑管理顾问在建筑项目实施阶段的作用得到了很好的发挥,基于最高的积极回应(同意),即 MK 顾问对规划和实施之间的偏差采取纠正措施的能力(X4)达到 68.35%,项目管理顾问的作用对项目工作进度有积极影响或意义,尽管相关值较低,相关值最高的是变量(X2)MK 顾问人员执行现有计划的一致性,相关值为 0.348,相关值最低的是变量(X5)MK 顾问管理项目成本的能力对项目工作进度的影响,相关值为 0.088。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Analisis SWOT dan Technique For Order Preference by Similarity to Ideal Solution (TOPSIS) untuk Strategi Pengembangan Usaha di Gapit 24 Klasifikasi Menggunakan Metode Random Forest untuk Awal Deteksi Diabetes Melitus Tipe 2 Rancang Ulang Alat Penghalus Rebana untuk Meminimumkan Waktu Proses Penghalusan Analisis Faktor Keterlambatan Penyelesaian Proyek Peningkatan Jalan Ruas Ambemali (Studi Kasus Jln. Belalo/Lasolo – Jln. Arisunggu) Perancangan Penyiraman Kandang Berbasis Arduino Uno Guna Menjaga Stabulitas Suhu dan Kelembapan
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1