How to treat energy storage as a transmission asset?

IF 3.3 Q3 ENERGY & FUELS MRS Energy & Sustainability Pub Date : 2020-07-01 DOI:10.1557/mre.2020.24
R. Konidena
{"title":"How to treat energy storage as a transmission asset?","authors":"R. Konidena","doi":"10.1557/mre.2020.24","DOIUrl":null,"url":null,"abstract":"For energy storage to be part of the transmission solution, storage developers need to work with transmission owners and follow the Regional Transmission Organization (RTO) transmission planning protocols. Federal Energy Regulatory Commission (FERC) Order 841 mostly treats Electric Storage Resource (ESR) as a generation asset. To date, no FERC order lays out a path for treating energy storage as a transmission asset. One of FERC-jurisdictional RTOs–Midcontinent Independent System Operator (MISO)–has sent a “storage as a transmission-only asset” proposal to FERC, which FERC did not reject but did not approve either. This MISO filing begs the question–how to treat energy storage as a transmission project? The industry needs to understand how RTO cost allocation works for new and existing transmission projects. To appreciate cost allocation, stakeholders need to grasp the fundamentals of transmission project categories. Because to put together a business case for storage, modeling is essential. And modeling for reliability and economic projects vary. Getting into the weeds of transmission planning is what it takes to treat storage as a transmission asset.","PeriodicalId":44802,"journal":{"name":"MRS Energy & Sustainability","volume":null,"pages":null},"PeriodicalIF":3.3000,"publicationDate":"2020-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1557/mre.2020.24","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"MRS Energy & Sustainability","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1557/mre.2020.24","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
引用次数: 4

Abstract

For energy storage to be part of the transmission solution, storage developers need to work with transmission owners and follow the Regional Transmission Organization (RTO) transmission planning protocols. Federal Energy Regulatory Commission (FERC) Order 841 mostly treats Electric Storage Resource (ESR) as a generation asset. To date, no FERC order lays out a path for treating energy storage as a transmission asset. One of FERC-jurisdictional RTOs–Midcontinent Independent System Operator (MISO)–has sent a “storage as a transmission-only asset” proposal to FERC, which FERC did not reject but did not approve either. This MISO filing begs the question–how to treat energy storage as a transmission project? The industry needs to understand how RTO cost allocation works for new and existing transmission projects. To appreciate cost allocation, stakeholders need to grasp the fundamentals of transmission project categories. Because to put together a business case for storage, modeling is essential. And modeling for reliability and economic projects vary. Getting into the weeds of transmission planning is what it takes to treat storage as a transmission asset.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
如何将储能视为输电资产?
为了使储能成为输电解决方案的一部分,储能开发商需要与输电业主合作,并遵循区域输电组织(RTO)的输电规划协议。联邦能源管理委员会(FERC)第841号命令主要将电力存储资源(ESR)视为发电资产。到目前为止,联邦能源管理委员会还没有命令将储能作为输电资产来处理。FERC管辖的rtos之一——中部独立系统运营商(MISO)——向FERC提交了一份“存储仅作为传输资产”的提案,FERC没有拒绝,但也没有批准。这份MISO文件回避了一个问题——如何将储能视为输电项目?该行业需要了解RTO成本分配对新建和现有输电项目的影响。为了更好地理解成本分配,利益相关者需要掌握输电项目类别的基本知识。因为要将存储的业务案例组合在一起,建模是必不可少的。可靠性和经济项目的模型各不相同。将存储视为一项传输资产,就需要深入到传输规划的杂草中。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
MRS Energy & Sustainability
MRS Energy & Sustainability ENERGY & FUELS-
CiteScore
6.40
自引率
2.30%
发文量
36
期刊最新文献
MXenes vs MBenes: Demystifying the materials of tomorrow’s carbon capture revolution Materials scarcity during the clean energy transition: Myths, challenges, and opportunities Carbon footprint inventory using life cycle energy analysis Advanced hybrid combustion systems as a part of efforts to achieve carbon neutrality of the vehicles Assessment of the penetration impact of renewable-rich electrical grids: The Jordanian grid as a case study
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1