DESIGN OF THE INTERCEPTOR-COLLECTOR AND WASTEWATER TREATMENT SYSTEM FOR POLLUTION MITIGATION: A CASE STUDY

Q4 Environmental Science WIT Transactions on Ecology and the Environment Pub Date : 2022-09-13 DOI:10.2495/awp220111
Bethy Merchán-Sanmartín, P. Carrión-Mero, Fernando Morante-Carballo, Josué Briones-Bitar, Adrián GONZALEZ-RUGEL, Hairo VERA-DEMERA
{"title":"DESIGN OF THE INTERCEPTOR-COLLECTOR AND WASTEWATER TREATMENT SYSTEM FOR POLLUTION MITIGATION: A CASE STUDY","authors":"Bethy Merchán-Sanmartín, P. Carrión-Mero, Fernando Morante-Carballo, Josué Briones-Bitar, Adrián GONZALEZ-RUGEL, Hairo VERA-DEMERA","doi":"10.2495/awp220111","DOIUrl":null,"url":null,"abstract":"Sustainable Development Goal 6 proposes clean water and sanitation for all. Urban parishes Veintimilla and Polibio Chávez of the Guaranda canton in Ecuador have a combined sewage network. However, they do not have an operational wastewater treatment plant (WTP), which discharges directly into the river generating significant pollution and affecting the health and well-being of the inhabitants. This work aims to design the interceptor-collector and treatment system for wastewater discharges to the Guaranda river, considering the technical aspects and sustainability criteria, contributing to the quality of life of its inhabitants, the mitigation of pollution, and the compliance with current regulations. The methodology used was: (i) review and analysis of existing information, which included topographical, social, economic, technical, and environmental restrictions; (ii) proposal and selection of alternatives; (iii) design of the selected alternative, with its respective budget, plans, and environmental analysis. The results were: (i) design errors in the existing system, industrial discharges contaminate domestic wastewater; (ii) alternatives were proposed that were assessed using the Likert scale, with number A1b being the winner; (iii) the estimated future population is 32,922 inhabitants, and the design period is 15 years, which generates a flow of 0.226 m 3 /s. The interceptor-collector consists of four bypass chambers; the WTP consists of two independent lines, each with preliminary treatment, a sand trap of 17.25 × 3.85 × 1.15 m, and percolating filters 15.4 × 7 × 2.4 m, and a clarifier of 15.4 m by 3.5 m in height. The budget is USD 941,953.49, including the environmental management plan.","PeriodicalId":35178,"journal":{"name":"WIT Transactions on Ecology and the Environment","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-09-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"WIT Transactions on Ecology and the Environment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2495/awp220111","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Environmental Science","Score":null,"Total":0}
引用次数: 0

Abstract

Sustainable Development Goal 6 proposes clean water and sanitation for all. Urban parishes Veintimilla and Polibio Chávez of the Guaranda canton in Ecuador have a combined sewage network. However, they do not have an operational wastewater treatment plant (WTP), which discharges directly into the river generating significant pollution and affecting the health and well-being of the inhabitants. This work aims to design the interceptor-collector and treatment system for wastewater discharges to the Guaranda river, considering the technical aspects and sustainability criteria, contributing to the quality of life of its inhabitants, the mitigation of pollution, and the compliance with current regulations. The methodology used was: (i) review and analysis of existing information, which included topographical, social, economic, technical, and environmental restrictions; (ii) proposal and selection of alternatives; (iii) design of the selected alternative, with its respective budget, plans, and environmental analysis. The results were: (i) design errors in the existing system, industrial discharges contaminate domestic wastewater; (ii) alternatives were proposed that were assessed using the Likert scale, with number A1b being the winner; (iii) the estimated future population is 32,922 inhabitants, and the design period is 15 years, which generates a flow of 0.226 m 3 /s. The interceptor-collector consists of four bypass chambers; the WTP consists of two independent lines, each with preliminary treatment, a sand trap of 17.25 × 3.85 × 1.15 m, and percolating filters 15.4 × 7 × 2.4 m, and a clarifier of 15.4 m by 3.5 m in height. The budget is USD 941,953.49, including the environmental management plan.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
减少污染的截流收集器和废水处理系统的设计:一个案例研究
可持续发展目标6提出为所有人提供清洁水和卫生设施。厄瓜多尔瓜兰达州的城市教区Veintimilla和Polibio Chávez有一个综合污水管网。然而,他们没有一个运行中的污水处理厂(WTP),直接排放到河流中,造成严重污染,影响居民的健康和福祉。本设计旨在设计瓜兰达河污水排放的拦截-收集和处理系统,考虑到技术方面和可持续性标准,有助于提高居民的生活质量,减轻污染,并符合现行法规。所使用的方法是:(i)审查和分析现有资料,其中包括地形、社会、经济、技术和环境限制;(ii)建议和选择备选方案;(iii)选定的备选方案的设计,包括预算、计划和环境分析。结果表明:(1)现有系统设计错误,工业排放污染生活污水;(ii)提出的备选方案使用李克特量表进行评估,编号A1b为获胜者;(iii)预计未来人口为32,922人,设计周期为15年,产生0.226立方米/秒的流量。截流收集器由四个旁通室组成;WTP由两条独立的管线组成,每条管线都进行了初步处理,分别是17.25 × 3.85 × 1.15 m的捕砂池、15.4 × 7 × 2.4 m的渗透过滤器和15.4 × 3.5 m的澄清池。预算为941,953.49美元,包括环境管理计划。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
WIT Transactions on Ecology and the Environment
WIT Transactions on Ecology and the Environment Environmental Science-Environmental Science (all)
CiteScore
1.10
自引率
0.00%
发文量
92
期刊介绍: WIT Transactions on Ecology and the Environment (ISSN: 1743-3541) includes volumes relating to the follow subject areas: Ecology, Environmental Engineering, Water Resources, Air Pollution, Design & Nature, Sustainable Development, Environmental Health
期刊最新文献
CRITICAL DISCUSSION ON BUILDING ENERGY RETROFIT POLICIES ESTABLISHING A CUSTOMIZED FRAMEWORK OF BIM EDUCATION PROGRAMS FOR OWNERS IN SOUTH KOREA CYCLING AS A SUSTAINABLE MOBILITY FORM IN THE MAGNA GRAECIA AREA OF THE CALABRIA REGION, ITALY ROAD AHEAD: SETTING THE BASIS FOR A TRANSFORMED MINIBUS TAXI INDUSTRY IN SOUTH AFRICA INDONESIA’S ENERGY POLICY DYNAMICS: A SUBSTANCE OF COMMITMENT AND CHALLENGE
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1