KENDALA INVESTASI DI ERA OTONOMI DAERAH (Studi Kasus Pembangunan Proyek PLTU di Kabupaten Batang)

Isa Ismail
{"title":"KENDALA INVESTASI DI ERA OTONOMI DAERAH (Studi Kasus Pembangunan Proyek PLTU di Kabupaten Batang)","authors":"Isa Ismail","doi":"10.14710/POLITIKA.5.1.2014.29-43","DOIUrl":null,"url":null,"abstract":"Research that was headlined  investment in Regional Autonomy era ( case study constraint the construction of PLTU project in the Batang Regency) is done using analysis of Pustaka about the concept of investment and the concept of regional autonomy. The study is done with the methodology of some research qualitative descriptive with purposive of sampling techniques in determining an informer and continues to be a snowball of sampling. Obtained data in field indicates that central program of government included in the program Master Plan for Acceleration and Expansion of Indonesia's Economic Development (MP3EI). The program of PLTU in Batang Regency worth more or less 38 trillion. Realization of PLTU project  development was delayed for two years since the early planning. The delay of PLTU project has  several problems, among others, such as lack of coordination between the central government and local governments, investors, a policy that overlap related regulations of marine conservation issued by regent, and the land acquisition process experiencing self denial of the owner of the land. Attempt completion constraint is still done through personal approaches between the local Government to the Government of the village, between the Government of the village with its citizens, especially the owner of the land where the project will be built and efforts in corporate social responsibility (CSR) by the investors realization with the construction of various public facilities to affected communities","PeriodicalId":32705,"journal":{"name":"Politika Jurnal Ilmu Politik","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2015-02-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Politika Jurnal Ilmu Politik","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14710/POLITIKA.5.1.2014.29-43","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Research that was headlined  investment in Regional Autonomy era ( case study constraint the construction of PLTU project in the Batang Regency) is done using analysis of Pustaka about the concept of investment and the concept of regional autonomy. The study is done with the methodology of some research qualitative descriptive with purposive of sampling techniques in determining an informer and continues to be a snowball of sampling. Obtained data in field indicates that central program of government included in the program Master Plan for Acceleration and Expansion of Indonesia's Economic Development (MP3EI). The program of PLTU in Batang Regency worth more or less 38 trillion. Realization of PLTU project  development was delayed for two years since the early planning. The delay of PLTU project has  several problems, among others, such as lack of coordination between the central government and local governments, investors, a policy that overlap related regulations of marine conservation issued by regent, and the land acquisition process experiencing self denial of the owner of the land. Attempt completion constraint is still done through personal approaches between the local Government to the Government of the village, between the Government of the village with its citizens, especially the owner of the land where the project will be built and efforts in corporate social responsibility (CSR) by the investors realization with the construction of various public facilities to affected communities
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
区域自治时代的投资障碍(stem区ptu项目案例研究)
以区域自治时代的投资为标题的研究(巴塘县PLTU项目建设的案例研究约束)使用了Pustaka关于投资概念和区域自治概念的分析。这项研究是用一些研究定性描述的方法完成的,目的是抽样技术来确定告密者,并继续成为抽样的雪球。实地获得的数据表明,政府的中央计划包括在印度尼西亚经济发展加速和扩大总体规划(MP3EI)计划中。巴塘县PLTU项目价值38万亿左右。PLTU项目开发的实现比早期规划推迟了两年。PLTU项目的延期存在中央与地方政府、投资者之间缺乏协调、摄政王颁布的海洋保护相关法规与政策重叠、土地征用过程中出现土地所有者自我否定等问题。尝试完成约束仍然是通过地方政府与村庄政府之间,村庄政府与其公民之间,特别是项目将要建设的土地所有者之间的个人方式,以及投资者通过为受影响社区建设各种公共设施来实现企业社会责任(CSR)的努力
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
12 weeks
期刊最新文献
Negara, Gerakan Islam Pasca-Fundamentalis dan Masa Depan Demokrasi di Indonesia: Kekuasaan Simbolik dan Upaya Konsolidasi Nationalist-Islamist Party in a Liberal Ecosystem: The Solidity and Campaign Strategy of the Prosperous Justice Party (PKS) during the 2014 and 2019 Elections Voter Behaviour and The Campaign Pattern of Candidates during Pandemics in Regional Head Election in Medan City, North Sumatra Delegitimisation of Indonesian Traditional Leaders: An Analysis in Minangkabau, West Sumatra Province Jokowi’s Sneakers Politics: Personal Branding, Politics of Imaging and Millenial Votes The 2019 Presidential Election
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1