{"title":"RELIABILITY ANALYSIS OF FULL-FACE TUNNEL BORING MACHINES WITH THE MONTE CARLO SIMULATION TECHNIQUE","authors":"R. Mikaeil, Hasel Amini Khoshalan, Mohammad Hossein Nasrollahi, A. Esmaeilzadeh","doi":"10.17794/rgn.2022.3.12","DOIUrl":null,"url":null,"abstract":"The high boring capability of full-face tunnel boring machines, especially in urban tunnels, has led to their increased use in tunnel excavation in various and unfavourable geological conditions. Therefore, many efforts have been made to predict and improve the performance of these machines. In this regard, most of the previous studies have focused on the effect of geological and mechanical properties of rock or soil. However, delays due to the maintenance and repair of these machines, which contribute to a major share of unwanted and unpredicted stops at work, have not been considered. Reliability analysis is a practical method based on studying the behaviour of breakdowns and maintenance of machines and systems. This approach can be suggested as part of the appropriate planning for machine maintenance and consequently reducing downtime and costs. In this way, it is possible to identify weaknesses and critical points of a machine or system of the boring process. In the present study, the reliability of the full-face tunnelling machine was analysed with the Monte Carlo simulation method. The studied machine is divided into 5 subsystems including mechanical, electrical, hydraulic, water and compressed air subsystems. Using breakdown data of about 24 months of boring operation, the reliability of each subsystem was simulated and evaluated. Eventually, the reliability of the boring machine was simulated using the Kamat-Riley (K-R) method. The results showed that if no maintenance operation is performed on the subsystems, the overall reliability of the boring machine will decline to zero after about 38 hours of continuous boring operation. Finally, to improve the overall reliability of the boring machine, based on accomplished reliability analysis, we suggest an effective preventive maintenance and repair system for keeping the machine in optimal operating conditions for a longer period.","PeriodicalId":44536,"journal":{"name":"Rudarsko-Geolosko-Naftni Zbornik","volume":null,"pages":null},"PeriodicalIF":1.2000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Rudarsko-Geolosko-Naftni Zbornik","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17794/rgn.2022.3.12","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"GEOSCIENCES, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 1

Abstract

The high boring capability of full-face tunnel boring machines, especially in urban tunnels, has led to their increased use in tunnel excavation in various and unfavourable geological conditions. Therefore, many efforts have been made to predict and improve the performance of these machines. In this regard, most of the previous studies have focused on the effect of geological and mechanical properties of rock or soil. However, delays due to the maintenance and repair of these machines, which contribute to a major share of unwanted and unpredicted stops at work, have not been considered. Reliability analysis is a practical method based on studying the behaviour of breakdowns and maintenance of machines and systems. This approach can be suggested as part of the appropriate planning for machine maintenance and consequently reducing downtime and costs. In this way, it is possible to identify weaknesses and critical points of a machine or system of the boring process. In the present study, the reliability of the full-face tunnelling machine was analysed with the Monte Carlo simulation method. The studied machine is divided into 5 subsystems including mechanical, electrical, hydraulic, water and compressed air subsystems. Using breakdown data of about 24 months of boring operation, the reliability of each subsystem was simulated and evaluated. Eventually, the reliability of the boring machine was simulated using the Kamat-Riley (K-R) method. The results showed that if no maintenance operation is performed on the subsystems, the overall reliability of the boring machine will decline to zero after about 38 hours of continuous boring operation. Finally, to improve the overall reliability of the boring machine, based on accomplished reliability analysis, we suggest an effective preventive maintenance and repair system for keeping the machine in optimal operating conditions for a longer period.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
全工作面隧道掘进机可靠性蒙特卡罗仿真分析
全工作面隧道掘进机的高掘进能力,特别是在城市隧道中,使得其在各种不利地质条件下的隧道开挖中得到越来越多的应用。因此,人们做出了许多努力来预测和提高这些机器的性能。在这方面,以往的研究大多集中在岩石或土壤的地质力学性质的影响上。然而,由于这些机器的维护和修理而造成的延误却没有被考虑在内,这些延误是造成工作中大部分不必要和意外停止的原因。可靠性分析是一种基于研究机器和系统的故障行为和维修的实用方法。这种方法可以作为适当的机器维护计划的一部分,从而减少停机时间和成本。通过这种方式,可以识别镗孔过程中机器或系统的弱点和关键点。本文采用蒙特卡罗模拟方法对全工作面掘进机的可靠性进行了分析。所研究的机器分为机械、电气、液压、水和压缩空气五个子系统。利用钻井作业24个月的故障数据,对各分系统的可靠性进行了仿真和评估。最后,采用Kamat-Riley (K-R)方法对镗床的可靠性进行了仿真。结果表明,如果不对各子系统进行维护操作,镗床在连续运行约38小时后,整体可靠性将下降到零。最后,为了提高镗床的整体可靠性,在已完成的可靠性分析的基础上,提出了一种有效的预防性维护和维修系统,以使镗床长期处于最佳运行状态。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
2.50
自引率
15.40%
发文量
50
审稿时长
12 weeks
期刊最新文献
A NEW TECHNIQUE BASED ON ANT COLONY OPTIMIZATION FOR DESIGNING MINING PUSHBACKS IN THE PRESENCE OF GEOLOGICAL UNCERTAINTY IMPROVED CONCEPTUAL DESIGN OF LILW REPOSITORY ONE-STEP ELECTROCHEMICAL SYNTHESIS OF PEDOT BASED COMPOSITES FOR SUPERCAPACITOR APPLICATIONS A COMPARATIVE STUDY OF THE BIVARIATE STATISTICAL METHODS AND THE ANALYTICAL HIERARCHICAL PROCESS FOR THE ASSESSMENT OF MASS MOVEMENT SUSCEPTIBILITY. A CASE STUDY: THE LM-116 ROAD – PERU THE INTERACTION AND SYNERGIC EFFECT OF PARTICLE SIZE ON FLOTATION EFFICIENCY: A COMPARISON STUDY OF RECOVERY BY SIZE, AND BY LIBERATION BETWEEN LAB AND INDUSTRIAL SCALE DATA
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1