A NEW TECHNIQUE BASED ON ANT COLONY OPTIMIZATION FOR DESIGNING MINING PUSHBACKS IN THE PRESENCE OF GEOLOGICAL UNCERTAINTY

IF 1.2 Q3 GEOSCIENCES, MULTIDISCIPLINARY Rudarsko-Geolosko-Naftni Zbornik Pub Date : 2023-01-01 DOI:10.17794/rgn.2023.1.10
Seyyed-Omid Gilani, S. Moosazadeh, R. Poormirzaee
{"title":"A NEW TECHNIQUE BASED ON ANT COLONY OPTIMIZATION FOR DESIGNING MINING PUSHBACKS IN THE PRESENCE OF GEOLOGICAL UNCERTAINTY","authors":"Seyyed-Omid Gilani, S. Moosazadeh, R. Poormirzaee","doi":"10.17794/rgn.2023.1.10","DOIUrl":null,"url":null,"abstract":"An essential task in the open-pit mine optimizing process is determining the extraction time of material located in the ultimate pit, considering some operational and economic constraints. The proper design of pushbacks has a significant impact on the optimum production planning. On the other hand, some uncertainty sources such as in-situ grade cause both deviations from production and financial goals. This paper presents an extension of a multi-stage formulation for risk-based pushback designing that utilizes the ant colony optimization (ACO) algorithm to solve it. For more detailed studies, two different strategies were developed according to statistical and probabilistic issues. The data of Songun copper mine located in NW Iran was used to evaluate the ability of the proposed approach in controlling the risk of deviation from production targets and increasing the project value. The results indicated the effectiveness of the proposed approach in pushback designing based on geological uncertainty. Examining different strategies showed that the technique based on multiple probability produces better solutions.","PeriodicalId":44536,"journal":{"name":"Rudarsko-Geolosko-Naftni Zbornik","volume":null,"pages":null},"PeriodicalIF":1.2000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Rudarsko-Geolosko-Naftni Zbornik","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17794/rgn.2023.1.10","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"GEOSCIENCES, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 1

Abstract

An essential task in the open-pit mine optimizing process is determining the extraction time of material located in the ultimate pit, considering some operational and economic constraints. The proper design of pushbacks has a significant impact on the optimum production planning. On the other hand, some uncertainty sources such as in-situ grade cause both deviations from production and financial goals. This paper presents an extension of a multi-stage formulation for risk-based pushback designing that utilizes the ant colony optimization (ACO) algorithm to solve it. For more detailed studies, two different strategies were developed according to statistical and probabilistic issues. The data of Songun copper mine located in NW Iran was used to evaluate the ability of the proposed approach in controlling the risk of deviation from production targets and increasing the project value. The results indicated the effectiveness of the proposed approach in pushback designing based on geological uncertainty. Examining different strategies showed that the technique based on multiple probability produces better solutions.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
一种基于蚁群优化的地质不确定性条件下采矿推挤设计新技术
露天矿优化过程中的一项重要任务是在考虑某些操作和经济约束的情况下,确定最终坑内物料的提取时间。延迟设计的合理与否对优化生产计划有着重要的影响。另一方面,一些不确定性来源,如原地品位,会导致生产和财务目标的偏差。本文提出了基于风险的推退设计的多阶段公式的扩展,利用蚁群优化(ACO)算法求解它。对于更详细的研究,根据统计和概率问题制定了两种不同的策略。以位于伊朗西北部的Songun铜矿为例,对该方法在控制生产目标偏离风险和提高项目价值方面的能力进行了评价。结果表明,该方法在地质不确定性条件下的推杆设计中是有效的。对不同策略的检验表明,基于多重概率的技术产生了更好的解决方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
2.50
自引率
15.40%
发文量
50
审稿时长
12 weeks
期刊最新文献
A NEW TECHNIQUE BASED ON ANT COLONY OPTIMIZATION FOR DESIGNING MINING PUSHBACKS IN THE PRESENCE OF GEOLOGICAL UNCERTAINTY IMPROVED CONCEPTUAL DESIGN OF LILW REPOSITORY ONE-STEP ELECTROCHEMICAL SYNTHESIS OF PEDOT BASED COMPOSITES FOR SUPERCAPACITOR APPLICATIONS A COMPARATIVE STUDY OF THE BIVARIATE STATISTICAL METHODS AND THE ANALYTICAL HIERARCHICAL PROCESS FOR THE ASSESSMENT OF MASS MOVEMENT SUSCEPTIBILITY. A CASE STUDY: THE LM-116 ROAD – PERU THE INTERACTION AND SYNERGIC EFFECT OF PARTICLE SIZE ON FLOTATION EFFICIENCY: A COMPARISON STUDY OF RECOVERY BY SIZE, AND BY LIBERATION BETWEEN LAB AND INDUSTRIAL SCALE DATA
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1