Optimization of assembly line based on work study

Shuang Lan, Xue Wang, Li-xin Ma
{"title":"Optimization of assembly line based on work study","authors":"Shuang Lan, Xue Wang, Li-xin Ma","doi":"10.1109/ICIEEM.2009.5344476","DOIUrl":null,"url":null,"abstract":"The target of the study is the assembly line of lamp in one company. We analyze the producing process in detail. We found that there existed some problems such as bottleneck process and unbalanced line. To solve these issues we used the MOD method in work study as well as ECRS principle. The new plan merged and simplified the entire operating process, reduced workers and increased the rate of production line balancing.","PeriodicalId":6326,"journal":{"name":"2009 16th International Conference on Industrial Engineering and Engineering Management","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2009-12-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"13","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 16th International Conference on Industrial Engineering and Engineering Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICIEEM.2009.5344476","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 13

Abstract

The target of the study is the assembly line of lamp in one company. We analyze the producing process in detail. We found that there existed some problems such as bottleneck process and unbalanced line. To solve these issues we used the MOD method in work study as well as ECRS principle. The new plan merged and simplified the entire operating process, reduced workers and increased the rate of production line balancing.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
基于工作研究的装配线优化
本研究的对象是某公司的灯具装配线。对生产过程进行了详细的分析。研究发现,在生产过程中存在瓶颈、生产线不平衡等问题。为了解决这些问题,我们在工作学习中运用了MOD方法和ECRS原理。新计划合并并简化了整个操作流程,减少了工人,提高了生产线平衡率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Binary search tree visualization algorithm Dynamic alliance partner selection and its negotiation strategy based on agent and resources Research on reverse logistics-oriented multisources inventory control model The syncretism of capital structure theory: An explanation from adjustment speed of capital structure Research on the security model for e-business process management
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1