ime Overrun in Construction Projects of Sulaimani City

N. Ali, P. Abdullah
{"title":"ime Overrun in Construction Projects of Sulaimani City","authors":"N. Ali, P. Abdullah","doi":"10.24086/aces2020/paper.260","DOIUrl":null,"url":null,"abstract":"Several constructional projects in Sulaimani face to the delay, during the stages of designing and implementation. The delay refers to various causes. There are several key persons) resources) (templates) (clients) (factors) (characteristics) (parameters) that have direct effects on delay of the projects. The study was conducted and depended on two different methods practical and theoretical parts, for performing practical part two specific elites were chose, the first elite was the expert engineers that had actual practical involvement in construction projects and the second elite was the contractors that had a real suffering from delays of their projects. While the theoretical part was depended on reviews for the existing studies to collect information. The practical result showed that the five most effective key persons were the (1-Laws and Regulations, 2-Contractor, 3-Designer, 4-Resident Engineer, 5-Site Location) seriously. While the reviewed results for the existing studies showed (1-Designer, 2-Finance/payment, 3-Weather, 4-Unforseen circumstances, 5-Lack of Site management by Contractor). Keywords: Constructional projects delay, Time extension, Mistakes of design, Plan and scheduling, Variation order.","PeriodicalId":85616,"journal":{"name":"The ACES bulletin. Association for Comparative Economic Studies (U.S.)","volume":"13 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The ACES bulletin. Association for Comparative Economic Studies (U.S.)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24086/aces2020/paper.260","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Several constructional projects in Sulaimani face to the delay, during the stages of designing and implementation. The delay refers to various causes. There are several key persons) resources) (templates) (clients) (factors) (characteristics) (parameters) that have direct effects on delay of the projects. The study was conducted and depended on two different methods practical and theoretical parts, for performing practical part two specific elites were chose, the first elite was the expert engineers that had actual practical involvement in construction projects and the second elite was the contractors that had a real suffering from delays of their projects. While the theoretical part was depended on reviews for the existing studies to collect information. The practical result showed that the five most effective key persons were the (1-Laws and Regulations, 2-Contractor, 3-Designer, 4-Resident Engineer, 5-Site Location) seriously. While the reviewed results for the existing studies showed (1-Designer, 2-Finance/payment, 3-Weather, 4-Unforseen circumstances, 5-Lack of Site management by Contractor). Keywords: Constructional projects delay, Time extension, Mistakes of design, Plan and scheduling, Variation order.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
苏莱曼尼市建设项目工期超限
苏莱曼尼的几个建设项目在设计和实施阶段面临延误。延迟是指各种原因。有几个关键的人(资源)(模板)(客户)(因素)(特征)(参数)对项目的延迟有直接影响。该研究是通过实践和理论两种不同的方法进行的,为了执行实践部分,选择了两个特定的精英,第一个精英是实际参与建设项目的专家工程师,第二个精英是真正遭受项目延误的承包商。而理论部分则依赖于对现有研究的综述来收集信息。实践结果表明,五个最有效的关键人员是(1-法律法规,2-承包商,3-设计师,4-驻地工程师,5-现场位置)。而现有研究的评审结果显示(1-设计师,2-财务/付款,3-天气,4-不可预见的情况,5-承包商缺乏现场管理)。关键词:建设项目延期,延期,设计失误,计划与调度,变型顺序
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Evaluation on the Performance of Hot Mix Asphalt (HMA) Using Polymer Modifications Creep Characteristics of Organic Soft Clay Soil Using Large–Scale Model Classifying the Heritage Elements Using Shape Grammars An Experimental Study On Concrete Containing Nano And/Or Micro Silica ime Overrun in Construction Projects of Sulaimani City
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1