Energy Storage as a Non-Wires Alternative for Deferring Distribution Capacity Investments

J. Deboever, J. Peppanen, NArindam Maitra, Giovanni Damato, J. Taylor, Jigar B. Patel
{"title":"Energy Storage as a Non-Wires Alternative for Deferring Distribution Capacity Investments","authors":"J. Deboever, J. Peppanen, NArindam Maitra, Giovanni Damato, J. Taylor, Jigar B. Patel","doi":"10.1109/TDC.2018.8440406","DOIUrl":null,"url":null,"abstract":"There is growing interest in Energy Storage Systems (ESS) and other distributed energy resources (DER) as non-wires alternatives to resolve distribution issues while also providing valuable services to the grid and to energy customers. One such use is to defer distribution capacity investments required due to load and/or DER growth. Selecting ESS power and energy ratings for capacity deferral requires time-series load profile data. This paper is a part of a longer-term objective of making it easy for utilities to consider energy storage systems within distribution planning. This paper proposes a practical planning-based approach to screen ESS (both power and energy ratings) to defer distribution capacity investments. More specifically, an approach is presented here that leverages linear power flow approximation to quickly perform many time-series ESS dispatch simulations enabling rapid ESS project screening for a large number of distribution feeders. This paper also illustrates intuitive ways to visualize optimal ESS power and energy ratings for different peak clipping objectives. The proposed ESS project screening approach is demonstrated on a real Hydro One distribution feeder.","PeriodicalId":6568,"journal":{"name":"2018 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)","volume":"33 1","pages":"1-5"},"PeriodicalIF":0.0000,"publicationDate":"2018-04-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"13","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE/PES Transmission and Distribution Conference and Exposition (T&D)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC.2018.8440406","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 13

Abstract

There is growing interest in Energy Storage Systems (ESS) and other distributed energy resources (DER) as non-wires alternatives to resolve distribution issues while also providing valuable services to the grid and to energy customers. One such use is to defer distribution capacity investments required due to load and/or DER growth. Selecting ESS power and energy ratings for capacity deferral requires time-series load profile data. This paper is a part of a longer-term objective of making it easy for utilities to consider energy storage systems within distribution planning. This paper proposes a practical planning-based approach to screen ESS (both power and energy ratings) to defer distribution capacity investments. More specifically, an approach is presented here that leverages linear power flow approximation to quickly perform many time-series ESS dispatch simulations enabling rapid ESS project screening for a large number of distribution feeders. This paper also illustrates intuitive ways to visualize optimal ESS power and energy ratings for different peak clipping objectives. The proposed ESS project screening approach is demonstrated on a real Hydro One distribution feeder.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
储能作为延迟配电容量投资的非电线替代方案
人们对储能系统(ESS)和其他分布式能源(DER)越来越感兴趣,因为它们不仅可以解决配电问题,还可以为电网和能源客户提供有价值的服务。其中一个用途是推迟由于负载和/或DER增长而需要的配电容量投资。为容量延迟选择ESS功率和能量额定值需要时序负载概况数据。本文是一个长期目标的一部分,该目标是使公用事业公司更容易在配电规划中考虑储能系统。本文提出了一种实用的基于规划的方法来筛选ESS(功率和能量等级),以推迟配电容量投资。更具体地说,本文提出了一种方法,该方法利用线性潮流近似来快速执行许多时间序列ESS调度模拟,从而能够快速筛选大量配电馈线的ESS项目。本文还说明了直观的方法来可视化最佳ESS功率和能量额定值为不同的削峰目标。提出的ESS项目筛选方法在实际的Hydro One配电馈线上进行了演示。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Patterns in Failure Rate of LV Distribution Components Comparison of University Departments Regarding Their Area and Load Profile of an Existing Campus Design of a Flexible AC/DC-Link Aggregate Protection Response of Motor Loads in Commercial Buildings Hardware-in-the-Loop Test Bed and Test Methodology for Microgrid Controller Evaluation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1