{"title":"Analysis of prediction methods of pressure decrease under drill bit while pulling-out drilling tool","authors":"F. Akhundov","doi":"10.37474/0365-8554/2022-11-15-19","DOIUrl":null,"url":null,"abstract":"The analysis of existing surveys associated with the occurrence of gas shows in the well drilling, for the elimination of which a great amount of cost and time spent has been carried out. The most widespread of them are the complications of gas shows while pulling-out of drilling tool from the well. It was revealed that to prevent such complications, it is necessary to reduce the pressure of drilling mud under the bit of pulled-out drill stem from the well. Existing methods of reducing the fluid pressure under the drill bit of a pulled-out drilling tool lie in the fill-up of drilling mud through the borehole annulus with special fill-up devices. Therefore, the fill-up is conducted through various quantities of pulled-out flares. Considering this, we offer a method of specification of reducing fluid pressure under the bit of pulled-out drill stem via squeezing the drilling mud through the drilling tubes. The fill-up period is defined from the graphics of continuous changes of shearing strength in time obtained during the periodic deterioration of structure in the moments of a maximum value of shearing strength via stirring the drilling mud in shearing rates corresponding to the speed of pulling-out of drilling tool. The maximum value of the shearing strength is specified via the dependence provided","PeriodicalId":8668,"journal":{"name":"Azerbaijan Oil Industry","volume":"83 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-11-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Azerbaijan Oil Industry","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37474/0365-8554/2022-11-15-19","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The analysis of existing surveys associated with the occurrence of gas shows in the well drilling, for the elimination of which a great amount of cost and time spent has been carried out. The most widespread of them are the complications of gas shows while pulling-out of drilling tool from the well. It was revealed that to prevent such complications, it is necessary to reduce the pressure of drilling mud under the bit of pulled-out drill stem from the well. Existing methods of reducing the fluid pressure under the drill bit of a pulled-out drilling tool lie in the fill-up of drilling mud through the borehole annulus with special fill-up devices. Therefore, the fill-up is conducted through various quantities of pulled-out flares. Considering this, we offer a method of specification of reducing fluid pressure under the bit of pulled-out drill stem via squeezing the drilling mud through the drilling tubes. The fill-up period is defined from the graphics of continuous changes of shearing strength in time obtained during the periodic deterioration of structure in the moments of a maximum value of shearing strength via stirring the drilling mud in shearing rates corresponding to the speed of pulling-out of drilling tool. The maximum value of the shearing strength is specified via the dependence provided