Designing and implementing temporary works schemes on UK nuclear licensed sites

IF 0.4 4区 工程技术 Q4 ENGINEERING, CIVIL Proceedings of the Institution of Civil Engineers-Civil Engineering Pub Date : 2022-12-01 DOI:10.1680/jcien.22.00153
S. O'Connor, C. McCord
{"title":"Designing and implementing temporary works schemes on UK nuclear licensed sites","authors":"S. O'Connor, C. McCord","doi":"10.1680/jcien.22.00153","DOIUrl":null,"url":null,"abstract":"Licencees of nuclear sites in the UK must demonstrate strict control over their construction works, including temporary works. In addition the Office for Nuclear Regulation will scrutinise designs, management controls and processes prior to giving permission for any works to start. This paper discusses the additional considerations for design and implementation of temporary works on UK nuclear sites. It includes case studies showing the steps taken to obtain nuclear safety committee and regulatory permission for tower cranes and a climbing scaffold for constructing a nuclear class 1 concrete structure in Cumbria.","PeriodicalId":54573,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Civil Engineering","volume":"20 1","pages":""},"PeriodicalIF":0.4000,"publicationDate":"2022-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Civil Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1680/jcien.22.00153","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

Abstract

Licencees of nuclear sites in the UK must demonstrate strict control over their construction works, including temporary works. In addition the Office for Nuclear Regulation will scrutinise designs, management controls and processes prior to giving permission for any works to start. This paper discusses the additional considerations for design and implementation of temporary works on UK nuclear sites. It includes case studies showing the steps taken to obtain nuclear safety committee and regulatory permission for tower cranes and a climbing scaffold for constructing a nuclear class 1 concrete structure in Cumbria.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
设计和实施英国核许可场址的临时工程方案
英国核设施的许可证持有人必须证明对其建筑工程(包括临时工程)的严格控制。此外,在批准任何工程开始之前,核管理办公室将仔细审查设计、管理控制和流程。本文讨论了英国核设施临时工程设计和实施的其他考虑因素。它包括案例研究,展示了为在坎布里亚郡建造1级核混凝土结构而获得核安全委员会和监管机构许可的塔式起重机和攀爬脚手架所采取的步骤。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
1.60
自引率
25.00%
发文量
68
审稿时长
>12 weeks
期刊介绍: Civil Engineering, listed by the Web of Science, is the ICE''s flagship journal. Practical and diverse in its scope, it publishes overview papers for the non-specialist on any subject relevant to civil engineering today. Topics range from landmark projects to philosophical, ethical, environmental, management and safety issues. Peer review, copyediting, and colour publication by Civil Engineering are free. If accepted, published papers are easily found by Google search, as well as in specialist citation indexes. There is also the option of making your article open access, should you wish to. Published authors receive a free electronic copy of their article to share with their peers. Furthermore, as well exposure to ICE''s 91,000-strong membership, published papers are promoted via our social media channels, accessing the wider civil engineering community. It is free to submit a paper to this journal. Papers appear Ahead of Print (below) as soon as they are ready to be published. Ahead of print articles are fully citable. using the DOI system
期刊最新文献
HS2: delivering a climate change adapted and resilient railway Infrastructure resilience under a changing climate: the urgent need for engineers to act Briefing: Tried-and-tested guidance for helping governments deliver the infrastructure people need Briefing: Groundwater flooding – a hidden hazard Briefing: The future of goods movement: envisioning net zero logistics
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1