Integrity Assurance in Major Projects Warrantee Period

Al Busaeedi Ahmed Musallam, Al Marzooqi Mahdi Mohamed, A RahmanAl-SayedTalal, H KhadeSanjay, Al Awadi Farooq Jaber, Haikal Nabil
{"title":"Integrity Assurance in Major Projects Warrantee Period","authors":"Al Busaeedi Ahmed Musallam, Al Marzooqi Mahdi Mohamed, A RahmanAl-SayedTalal, H KhadeSanjay, Al Awadi Farooq Jaber, Haikal Nabil","doi":"10.2118/193061-MS","DOIUrl":null,"url":null,"abstract":"\n Through this paper, the author intends to share the valuable experience and benefits of introducing the key element of Integrity Assurance - the initial inspection during the EPC warrantee period in a structured manner and ensure the risks are minimized into the commissioning and Operating stages for major critical project.\n ADNOC OFFSHORE is recognized for its pioneering and innovative approach. As one of the major Oil & Gas producers worldwide, the Company philosophy is to build a culture where critical Integrity Deliverables are embedded through customsied locally designed Code of Practice, known as \"Integrity Assurance in Projects\" that is monitored through a Value Assurance Process (VAP) stages. This enables robust control of Integrity Measures upfront and early identification of Integrity risks, with proactive mitigations based on experience from previous Projects. To further ensure the Integrity deliverables are strictly followed during the EPC; a well laid-out plan is rolled to the Project commissioning team by identifying and defining the non-intrusive NDT of piping system hot-spots as well as thorough internal inspection of typical medium risk high pressure equipment within the first 12 months of operations which fall under the EPC warrantee period. Being in the Project EPC phase, none of the items are classified under \"High Risk\" and are already eliminated through robust engineering. The inspection is scheduled considering minimal production impact.\n Following this initiative enables a structure that is directed towards the prevention of operating critical facilities and minimizes the liklihood of unknown HSE and business risks impacting the delivery of the project to the production phase. The equipment warrentee will be in force after the successful commissioning as per EPC contract agreement.\n One of the key Integrity deliverables is the implementation of Baseline Inspection. The baseline RBI Passport system has been broadly adopted across the Company operational sites and supports the safe continuous employment of assets to meet production targets. The high-risk items are already eliminated and mitigated during the EPC Engineering phase. Through baseline RBI study, the medium risk hotspots are identified for random cross-check during the EPC warrantee period with the obvious intention of ensuring the risk levels are well mitigated. If any deterioration or anomalies detected during the first inspection the same can be rectified through EPC warrantee; thereby saving the Company resources and cost. This innovative approach has been successfully implemented in all of the current on-going Full Field Development projects and has proven to be of great value by ensuring a high quality result whilst attracting significant cost savings. Some of the key successes realized through the roll out of the warrantee period inspection initiative include: Early interventions through selective assessment particularly the medium risk hot-spots. This is achieved by using NDT contract team and cross-checking of the actual site inspection atleast 6 months after commissioning to ascertain the process conditions and impact on the newly commissioned facility. The project realized advantages such as the timely realization of risk reduction. Early identification of these risks led to a significant cost saving in CAPEX / OPEX and enabled a smooth handover at the commissioning stage.Long term benefits have proven to aid the identification and prevention of failures, minimize the occurences of unplanned shutdowns, and optimization of the Preventive Maintenance & Inspection program. Any surprises related to non-compliances are addressed through the valid EPC contract. Realisation of these benefits and repetitive cost savings provides added confidence to stake-holders during the entire life-cycle of the facilities.\n ADNOC OFFSHORE is the first and only company within the ADNOC group to roll out such an initiative and encourage proactive direct involvement and integration of the Asset Integrity Division functions for a major full field development project. It is believed that this is also a unique approach for the MENA region by injection of decades of operational skill, knowledge and experience together with and lessons learned into the early project phases.","PeriodicalId":11014,"journal":{"name":"Day 1 Mon, November 12, 2018","volume":"221 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Mon, November 12, 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/193061-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Through this paper, the author intends to share the valuable experience and benefits of introducing the key element of Integrity Assurance - the initial inspection during the EPC warrantee period in a structured manner and ensure the risks are minimized into the commissioning and Operating stages for major critical project. ADNOC OFFSHORE is recognized for its pioneering and innovative approach. As one of the major Oil & Gas producers worldwide, the Company philosophy is to build a culture where critical Integrity Deliverables are embedded through customsied locally designed Code of Practice, known as "Integrity Assurance in Projects" that is monitored through a Value Assurance Process (VAP) stages. This enables robust control of Integrity Measures upfront and early identification of Integrity risks, with proactive mitigations based on experience from previous Projects. To further ensure the Integrity deliverables are strictly followed during the EPC; a well laid-out plan is rolled to the Project commissioning team by identifying and defining the non-intrusive NDT of piping system hot-spots as well as thorough internal inspection of typical medium risk high pressure equipment within the first 12 months of operations which fall under the EPC warrantee period. Being in the Project EPC phase, none of the items are classified under "High Risk" and are already eliminated through robust engineering. The inspection is scheduled considering minimal production impact. Following this initiative enables a structure that is directed towards the prevention of operating critical facilities and minimizes the liklihood of unknown HSE and business risks impacting the delivery of the project to the production phase. The equipment warrentee will be in force after the successful commissioning as per EPC contract agreement. One of the key Integrity deliverables is the implementation of Baseline Inspection. The baseline RBI Passport system has been broadly adopted across the Company operational sites and supports the safe continuous employment of assets to meet production targets. The high-risk items are already eliminated and mitigated during the EPC Engineering phase. Through baseline RBI study, the medium risk hotspots are identified for random cross-check during the EPC warrantee period with the obvious intention of ensuring the risk levels are well mitigated. If any deterioration or anomalies detected during the first inspection the same can be rectified through EPC warrantee; thereby saving the Company resources and cost. This innovative approach has been successfully implemented in all of the current on-going Full Field Development projects and has proven to be of great value by ensuring a high quality result whilst attracting significant cost savings. Some of the key successes realized through the roll out of the warrantee period inspection initiative include: Early interventions through selective assessment particularly the medium risk hot-spots. This is achieved by using NDT contract team and cross-checking of the actual site inspection atleast 6 months after commissioning to ascertain the process conditions and impact on the newly commissioned facility. The project realized advantages such as the timely realization of risk reduction. Early identification of these risks led to a significant cost saving in CAPEX / OPEX and enabled a smooth handover at the commissioning stage.Long term benefits have proven to aid the identification and prevention of failures, minimize the occurences of unplanned shutdowns, and optimization of the Preventive Maintenance & Inspection program. Any surprises related to non-compliances are addressed through the valid EPC contract. Realisation of these benefits and repetitive cost savings provides added confidence to stake-holders during the entire life-cycle of the facilities. ADNOC OFFSHORE is the first and only company within the ADNOC group to roll out such an initiative and encourage proactive direct involvement and integration of the Asset Integrity Division functions for a major full field development project. It is believed that this is also a unique approach for the MENA region by injection of decades of operational skill, knowledge and experience together with and lessons learned into the early project phases.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
重大工程保证期内的诚信保证
本文旨在通过对重大关键工程引入完整性保障的关键要素——EPC质保期初检的结构化方式,将完整性保障的风险降至最低,分享其宝贵经验和益处。ADNOC OFFSHORE以其开创性和创新的方法而闻名。作为全球主要的石油和天然气生产商之一,公司的理念是建立一种文化,通过定制的本地设计的行为准则嵌入关键的完整性交付物,称为“项目完整性保证”,通过价值保证过程(VAP)阶段进行监控。这使得能够在前期对完整性措施进行稳健的控制,并尽早识别完整性风险,并根据以前项目的经验进行主动缓解。进一步确保在EPC期间严格遵守诚信交付成果;通过确定和定义管道系统热点的非侵入式无损检测,以及在EPC保修期内的前12个月内对典型中风险高压设备进行彻底的内部检查,向项目调试团队提供良好的布置计划。在项目EPC阶段,没有一个项目被归类为“高风险”,并且已经通过强大的工程消除了。检查的安排考虑到对生产的影响最小。遵循这一倡议,可以建立一个旨在防止关键设施运行的结构,并最大限度地减少影响项目交付到生产阶段的未知HSE和业务风险的可能性。设备保修将在调试成功后根据EPC合同协议生效。关键的完整性交付物之一是基线检查的实施。基准RBI Passport系统已广泛应用于公司的各个运营场所,并支持资产的安全连续使用,以满足生产目标。在EPC工程阶段,高风险项目已经被消除和减轻。通过基准RBI研究,确定EPC质保期内的中等风险热点,进行随机交叉检查,其目的显然是确保风险水平得到很好的降低。如果在第一次检查中发现任何劣化或异常,可以通过EPC保修进行纠正;从而节省公司的资源和成本。这种创新的方法已经在目前所有正在进行的全油田开发项目中成功实施,并被证明具有巨大的价值,可以确保高质量的结果,同时显著节省成本。通过推出保修期检查计划实现的一些关键成功包括:通过选择性评估,特别是对中等风险热点进行早期干预。这是通过NDT合同团队和在调试后至少6个月的实际现场检查的交叉检查来实现的,以确定工艺条件和对新投产设施的影响。项目实现了及时实现风险降低等优势。早期识别这些风险可以显著节省CAPEX / OPEX成本,并使调试阶段的交接顺利进行。长期效益已被证明有助于识别和预防故障,最大限度地减少意外停机的发生,并优化预防性维护和检查程序。任何与不合规相关的意外都通过有效的EPC合同解决。实现这些好处和重复的成本节约为利益相关者在设施的整个生命周期中增加了信心。ADNOC OFFSHORE是ADNOC集团中第一家也是唯一一家推出此类举措的公司,并鼓励资产完整性部门积极直接参与并整合主要的全油田开发项目。人们认为,这也是中东和北非地区的一种独特方法,将数十年的业务技能、知识和经验以及吸取的教训注入到项目的早期阶段。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Does the kappa number method accurately reflect lignin content in nonwood pulps? Using multistage models to evaluate how pulp washing after the first extraction stage impacts elemental chlorine-free bleach demand Understanding the risks and rewards of using 50% vs. 10% strength peroxide in pulp bleach plants Understanding the pulping and bleaching performances of eucalyptus woods affected by physiological disturbance Measurements of the Inorganic Scale Buildup Rate on Downhole Completion Equipment – Debris Barrier Screens
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1