ANALISIS DAMPAK OVERLOAD TRANSFORMATOR TERHADAP KUALITAS DAYA GARDU K622 PENYULANG PELANGI PT. PLN ( PERSERO ) ULP KARANG

Jeckson Jeckson, Azis Prayuda, Yenni Afrida
{"title":"ANALISIS DAMPAK OVERLOAD TRANSFORMATOR TERHADAP KUALITAS DAYA GARDU K622 PENYULANG PELANGI PT. PLN ( PERSERO ) ULP KARANG","authors":"Jeckson Jeckson, Azis Prayuda, Yenni Afrida","doi":"10.36269/jtr.v4i1.986","DOIUrl":null,"url":null,"abstract":"Transformer overload occurs in one of the distribution transformers in PT. PLN (Persero) ULP Karang,namely the K622 Distribution Transformer at the Rainbow Feeder with a load of 110.16% exceeding the standard set by SPLN, which is 80%. This study aims to find out how to overcome the Overload problem in the K622 distribution substation transformer on The Rainbow and get the size of the K622 distribution substation transformer load before and after the Uprating Transformer. From the results of uprating, the percentage of transformer loading value before uprating transformers was carried out by 110.16% and after uprating transformers by 26.38% so that it decreased by 83.78%. This means that the uprating transformer is one of the methods that can be used to overcome excess loads.","PeriodicalId":31626,"journal":{"name":"Volt Jurnal Ilmiah Pendidikan Teknik Elektro","volume":"8 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-05-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Volt Jurnal Ilmiah Pendidikan Teknik Elektro","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36269/jtr.v4i1.986","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Transformer overload occurs in one of the distribution transformers in PT. PLN (Persero) ULP Karang,namely the K622 Distribution Transformer at the Rainbow Feeder with a load of 110.16% exceeding the standard set by SPLN, which is 80%. This study aims to find out how to overcome the Overload problem in the K622 distribution substation transformer on The Rainbow and get the size of the K622 distribution substation transformer load before and after the Uprating Transformer. From the results of uprating, the percentage of transformer loading value before uprating transformers was carried out by 110.16% and after uprating transformers by 26.38% so that it decreased by 83.78%. This means that the uprating transformer is one of the methods that can be used to overcome excess loads.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
分析变压器过载对珊瑚PT. PLN (PERSERO)彩虹反转的影响
PT. PLN (Persero) ULP Karang的其中一台配电变压器发生变压器过载,即彩虹馈线处的K622配电变压器,其负荷超出SPLN规定的80%的标准110.16%。本研究旨在找出如何克服彩虹号上K622配电变电站变压器的过载问题,得到升级变压器前后K622配电变电站变压器负荷的大小。从升级结果来看,变压器升级前和升级后的负荷值分别占比分别为110.16%和26.38%,降低了83.78%。这意味着升级变压器是可以用来克服过载的方法之一。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
审稿时长
24 weeks
期刊最新文献
Perancangan PLTS Untuk Sumber Daya Lampu Penerangan Jalan Desa Iringmulyo Metro Perancangan Rangkaian Forward-Reverse pada Motor 3 Fasa Sistem Monitoring dan Kontrol Katup Pendingin terhadap Temperatur Air Outfall PLTU Pengembangan E-Modul Interaktif Instalasi Penerangan Listrik di Pendidikan Vokasi Pengembangan E-Book Pekerjaan Dasar Elektromekanik Berbasis Student Facilitator and Explaining
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1