{"title":"Power transformer testing at Manitoba Hydro's high voltage test facility","authors":"W. McDermid, J. Lambert","doi":"10.1109/ICHVE.2012.6357061","DOIUrl":null,"url":null,"abstract":"Manitoba Hydro has constructed a high voltage test facility for full electrical testing of equipment rated up to 550 kVac and 500 kVdc. The second stage of the project is the addition of a test system for power transformers up to 310 MVA 3-phase and up to 400 MVA 1-phase. This test system is based on a voltage source converter and includes compensation to facilitate load loss tests. The paper provides some details on the various aspects of the work.","PeriodicalId":6375,"journal":{"name":"2012 International Conference on High Voltage Engineering and Application","volume":"159 1","pages":"92-94"},"PeriodicalIF":0.0000,"publicationDate":"2012-11-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 International Conference on High Voltage Engineering and Application","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICHVE.2012.6357061","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4
Abstract
Manitoba Hydro has constructed a high voltage test facility for full electrical testing of equipment rated up to 550 kVac and 500 kVdc. The second stage of the project is the addition of a test system for power transformers up to 310 MVA 3-phase and up to 400 MVA 1-phase. This test system is based on a voltage source converter and includes compensation to facilitate load loss tests. The paper provides some details on the various aspects of the work.