Cyclic Loading Test Facility for Ballast Bed of High-speed Railway

Xuejun Wang, Jianghua Pu, Peng Wu, H. San, Mingfang Chen
{"title":"Cyclic Loading Test Facility for Ballast Bed of High-speed Railway","authors":"Xuejun Wang, Jianghua Pu, Peng Wu, H. San, Mingfang Chen","doi":"10.1109/DDCLS.2019.8908874","DOIUrl":null,"url":null,"abstract":"In this paper, a new full-scale indoor ballasted ballast bed cyclic loading test-bed is introduced. Based on the actual operation of high-speed train, the corresponding relationship between the simulation parameters of loading process and the actual operation parameters is analyzed, and the hydraulic transmission and control system of the cyclic loading test-bed, which can simulate the actual operation of vehicles are designed. According to the simulated parameters and test methods of the cyclic loading test bench, the hydraulic circuit is built, and the electro-hydraulic proportional key technology is used to precisely control the hydraulic circuit. The principle and characteristics of the hydraulic system of the test-bed are emphatically expounded, and the performance of the test model is verified by comparing the test results.","PeriodicalId":6699,"journal":{"name":"2019 IEEE 8th Data Driven Control and Learning Systems Conference (DDCLS)","volume":"1 1","pages":"1377-1381"},"PeriodicalIF":0.0000,"publicationDate":"2019-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 IEEE 8th Data Driven Control and Learning Systems Conference (DDCLS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/DDCLS.2019.8908874","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In this paper, a new full-scale indoor ballasted ballast bed cyclic loading test-bed is introduced. Based on the actual operation of high-speed train, the corresponding relationship between the simulation parameters of loading process and the actual operation parameters is analyzed, and the hydraulic transmission and control system of the cyclic loading test-bed, which can simulate the actual operation of vehicles are designed. According to the simulated parameters and test methods of the cyclic loading test bench, the hydraulic circuit is built, and the electro-hydraulic proportional key technology is used to precisely control the hydraulic circuit. The principle and characteristics of the hydraulic system of the test-bed are emphatically expounded, and the performance of the test model is verified by comparing the test results.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
高速铁路道床循环加载试验装置
本文介绍了一种新型全尺寸室内有碴压载床循环加载试验台。基于高速列车的实际运行,分析了加载过程仿真参数与实际运行参数之间的对应关系,设计了能够模拟车辆实际运行的循环加载试验台液压传动与控制系统。根据循环加载试验台的仿真参数和试验方法,搭建液压回路,采用电液比例关键技术对液压回路进行精确控制。着重阐述了试验台液压系统的工作原理和特点,并通过对比试验结果验证了试验模型的性能。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
An Incremental Conductance Method Based on Fuzzy Control Simulation of the Array Signals Processing Based on Automatic Gain Control for Two-Wave Mixing Interferometer An Intelligent Supervision System of Environmental Pollution in Industrial Park Iterative learning control with optimal learning gain for recharging of Lithium-ion battery Integrated Position and Speed Control for PMSM Servo System Based on Extended State Observer
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1