{"title":"RENOVATION OF MUSHOLLA AL IKHLAS AT JL. RAWASARI TIMUR NO.18, RT.18/RW.2, CEMPAKA PUTIH TIMUR, JAKARTA PUSAT","authors":"Sri Kurniasih, Inggit Musdinar, D. Kurniawan","doi":"10.33068/iccd.vol3.iss1.415","DOIUrl":null,"url":null,"abstract":"The current condition of Mushollah Al Ikhlas needs to be developed because the congregation of Mushollah Al Ikhlas is increasing and increasingly unable to be accommodated. In addition to the height of the bathroom floor which is not comfortable to use, the number of toilets is only one, there is only one ablution area, there is no division of ablution areas for men and women. When Friday prayers are often not accommodated, the congregation is often not accommodated, especially when the month of Ramadan arrives, the congregation is not accommodated so that they are forced to worship in the road area around the Al Ikhlas Mosque. To overcome this problem, the manager of the Al Ikhlas Mushollah wants to increase the Mushollah room to 2 floors. Based on these conditions, it is necessary to develop and add facilities for the Mushollah Al Ikhlas, thus it is necessary to design the renovation of the Mushollah Al Ikhlas as a first step before the construction of the renovation of the Mushollah Al Ikhlas. The method of implementing the activities uses the Architectural Design Process. Where the design of the renovation of the Mushollah Al Ikhlas is adjusted to the input from the manager of the Mushollah, while the working drawings of the design of the renovation of the Mushollah are adjusted to architectural standards. The purpose of the Mushollah renovation design is so that the Mushollah is able to accommodate worshipers when performing Friday prayers and tarawih activities during the month of Ramadan in accordance with architectural standards and in accordance with the concept of the Cempaka Putih Mushollah, so that provide comfort for the congregation of Mushollah. The stages of implementing the activity begin with licensing the implementation of activities, site surveys or location observations, coordination with the mosque management, measuring and drawing the mosque to be renovated, making working drawings, Budget Plans, and 3D drawings of buildings, drawing consultations, construction of mosque renovations, monitoring development progress. The result of this activity is the application of architectural design in the construction of the renovation of the Al Ikhlas mosque in Cempaka Putih, Central Jakarta. ","PeriodicalId":6698,"journal":{"name":"2019 IEEE 37th International Conference on Computer Design (ICCD)","volume":"14 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-10-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 IEEE 37th International Conference on Computer Design (ICCD)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33068/iccd.vol3.iss1.415","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The current condition of Mushollah Al Ikhlas needs to be developed because the congregation of Mushollah Al Ikhlas is increasing and increasingly unable to be accommodated. In addition to the height of the bathroom floor which is not comfortable to use, the number of toilets is only one, there is only one ablution area, there is no division of ablution areas for men and women. When Friday prayers are often not accommodated, the congregation is often not accommodated, especially when the month of Ramadan arrives, the congregation is not accommodated so that they are forced to worship in the road area around the Al Ikhlas Mosque. To overcome this problem, the manager of the Al Ikhlas Mushollah wants to increase the Mushollah room to 2 floors. Based on these conditions, it is necessary to develop and add facilities for the Mushollah Al Ikhlas, thus it is necessary to design the renovation of the Mushollah Al Ikhlas as a first step before the construction of the renovation of the Mushollah Al Ikhlas. The method of implementing the activities uses the Architectural Design Process. Where the design of the renovation of the Mushollah Al Ikhlas is adjusted to the input from the manager of the Mushollah, while the working drawings of the design of the renovation of the Mushollah are adjusted to architectural standards. The purpose of the Mushollah renovation design is so that the Mushollah is able to accommodate worshipers when performing Friday prayers and tarawih activities during the month of Ramadan in accordance with architectural standards and in accordance with the concept of the Cempaka Putih Mushollah, so that provide comfort for the congregation of Mushollah. The stages of implementing the activity begin with licensing the implementation of activities, site surveys or location observations, coordination with the mosque management, measuring and drawing the mosque to be renovated, making working drawings, Budget Plans, and 3D drawings of buildings, drawing consultations, construction of mosque renovations, monitoring development progress. The result of this activity is the application of architectural design in the construction of the renovation of the Al Ikhlas mosque in Cempaka Putih, Central Jakarta.
伊斯兰教徒的现状需要得到改善,因为伊斯兰教徒的会众越来越多,越来越无法容纳。除了卫生间地板高度不舒服使用外,卫生间数量只有一个,只有一个洗浴区,没有男女洗浴区之分。当星期五的祈祷往往得不到满足时,会众往往得不到满足,特别是当斋月到来时,会众得不到满足,因此他们被迫在Al Ikhlas清真寺周围的道路上做礼拜。为了解决这个问题,Al Ikhlas Mushollah的经理想把Mushollah房间增加到2层。在这些条件的基础上,有必要开发和增加穆斯卡拉的设施,因此有必要设计穆斯卡拉的改造,作为穆斯卡拉改造施工之前的第一步。实现这些活动的方法使用了架构设计过程。其中Mushollah Al Ikhlas的改造设计是根据Mushollah经理的意见进行调整的,而Mushollah的改造设计的工作图纸是根据建筑标准进行调整的。Mushollah翻新设计的目的是使Mushollah能够根据建筑标准和Cempaka Putih Mushollah的概念,在星期五祈祷和斋月期间进行塔拉瓦活动时容纳朝拜者,从而为Mushollah的会众提供舒适。活动的实施阶段从活动的实施许可,现场调查或位置观察,与清真寺管理部门协调,测量和绘制要翻新的清真寺,制作施工图,预算计划和建筑物的3D图,图纸咨询,清真寺翻新的施工,监测开发进度开始。这项活动的结果是将建筑设计应用于雅加达中部Cempaka Putih的Al Ikhlas清真寺的改造施工中。