Evaluating the effect of accelerated construction method on project life cycle cost

IF 1.9 Q3 MANAGEMENT Infrastructure Asset Management Pub Date : 2023-07-06 DOI:10.1680/jinam.23.00021
M. El-Far, R. Sabry, M. Kotb
{"title":"Evaluating the effect of accelerated construction method on project life cycle cost","authors":"M. El-Far, R. Sabry, M. Kotb","doi":"10.1680/jinam.23.00021","DOIUrl":null,"url":null,"abstract":"Construction contributes to cities development. In Egypt, many projects had established using the accelerated method (ACM), others were traditional (TCM). Their life cycle cost (LCC) is analyzed to determine the benefit cost (BC) and decide the construction optimum way. In this paper, a Comparative study between LCC of ACM and TCM was held to improve the decision-making to form reasonable judgments on projects’ economics throughout their life cycle. The main question is what is the optimum way of construction to reach the highest benefit cost? Mustafa El-Nahass axis in Cairo studied, using LCC analysis to determine the development BC by analyzing the traffic impact before and after development. It was considered that operation cost (OC) of the axis were fuel and exhaust. Savings from OC by the ACM expressed by the case study BC. The main findings are that government entities should develop guidelines establishing the maximum time for construction. According to a prior study, extending construction time had no detrimental impact on public interest in these places. LCC study of the project was used to estimate this limit. This code specifies the regions to be classified based on traffic and population, and the maximum time for construction.","PeriodicalId":43387,"journal":{"name":"Infrastructure Asset Management","volume":"60 1","pages":""},"PeriodicalIF":1.9000,"publicationDate":"2023-07-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Infrastructure Asset Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jinam.23.00021","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 1

Abstract

Construction contributes to cities development. In Egypt, many projects had established using the accelerated method (ACM), others were traditional (TCM). Their life cycle cost (LCC) is analyzed to determine the benefit cost (BC) and decide the construction optimum way. In this paper, a Comparative study between LCC of ACM and TCM was held to improve the decision-making to form reasonable judgments on projects’ economics throughout their life cycle. The main question is what is the optimum way of construction to reach the highest benefit cost? Mustafa El-Nahass axis in Cairo studied, using LCC analysis to determine the development BC by analyzing the traffic impact before and after development. It was considered that operation cost (OC) of the axis were fuel and exhaust. Savings from OC by the ACM expressed by the case study BC. The main findings are that government entities should develop guidelines establishing the maximum time for construction. According to a prior study, extending construction time had no detrimental impact on public interest in these places. LCC study of the project was used to estimate this limit. This code specifies the regions to be classified based on traffic and population, and the maximum time for construction.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
加速施工法对项目全生命周期成本的影响评价
建设促进城市发展。在埃及,许多项目采用了加速法(ACM),其他项目采用了传统法(TCM)。对其全寿命周期成本进行分析,确定效益成本,确定施工优化方式。本文将ACM的LCC与TCM的LCC进行比较研究,以改进决策,形成对项目全生命周期经济的合理判断。主要的问题是什么是施工的最佳方式,以达到最高的效益成本?Mustafa El-Nahass axis在开罗进行了研究,通过分析开发前后的交通影响,使用LCC分析来确定开发BC。认为轴的运行成本为燃料和废气。ACM从OC节省的费用通过案例研究BC表示。主要结论是,政府实体应制定指导方针,确定最长施工时间。根据先前的一项研究,延长施工时间对这些地方的公共利益没有不利影响。利用项目的LCC研究来估计这一极限。该规范规定了根据交通和人口以及最长建设时间进行分类的地区。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
2.70
自引率
14.30%
发文量
18
期刊最新文献
Exploration of the impact of junction characteristics on pedestrian red light violation Viability rubric of FRP composites for civil infrastructure applications Automated early estimation of bridge interventions, possession windows and costs Multi-objective optimization of building planning energy saving based on genetic algorithm Evaluating the impact of flexible offices in coping with the uncertainty on future demand
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1