Application of Integrated Asset Modeling Approaches for Reservoir Management of a Large Oil Field in Western Siberia

T. Koshkin, Azat Firdavisovich Sayfutdinov, Viktor Aleksandrovich Kukushkin, Pavel Vladimirovich Markov
{"title":"Application of Integrated Asset Modeling Approaches for Reservoir Management of a Large Oil Field in Western Siberia","authors":"T. Koshkin, Azat Firdavisovich Sayfutdinov, Viktor Aleksandrovich Kukushkin, Pavel Vladimirovich Markov","doi":"10.2118/206538-ms","DOIUrl":null,"url":null,"abstract":"\n The article reviews the development and implementation of a digital twin for one of the large fields of LUKOIL-West Siberia LLC. The project team has developed an integrated asset model (IAM) of an oil field at a late stage of its development, which is used both for making managerial decisions and in the operational work of the engineering and technical service. The IAM includes simplified models of reservoirs, models of wells and gathering systems, as well as simplified models of plants. The resulting model can produce short-term assumptions regarding production levels (up to 1 year) and is highly sustainable, which is confirmed by the examples given in this article as to the application of IAM for various production tasks. The developed automated tools allow making prompt decisions to optimize well stock operation, as well as to reveal deviations in the process parameters of downhole pumping equipment and metering facilities. The use of IAM tools enable production functions to perform many application tasks related to forecasting well operation modes and evaluating the existing production capacities of the field. The cases presented in this paper serve as a good practice for application of the IM by assets in their activities and can be implemented for similar brownfields.","PeriodicalId":10970,"journal":{"name":"Day 1 Tue, October 12, 2021","volume":"24 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-10-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Tue, October 12, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/206538-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The article reviews the development and implementation of a digital twin for one of the large fields of LUKOIL-West Siberia LLC. The project team has developed an integrated asset model (IAM) of an oil field at a late stage of its development, which is used both for making managerial decisions and in the operational work of the engineering and technical service. The IAM includes simplified models of reservoirs, models of wells and gathering systems, as well as simplified models of plants. The resulting model can produce short-term assumptions regarding production levels (up to 1 year) and is highly sustainable, which is confirmed by the examples given in this article as to the application of IAM for various production tasks. The developed automated tools allow making prompt decisions to optimize well stock operation, as well as to reveal deviations in the process parameters of downhole pumping equipment and metering facilities. The use of IAM tools enable production functions to perform many application tasks related to forecasting well operation modes and evaluating the existing production capacities of the field. The cases presented in this paper serve as a good practice for application of the IM by assets in their activities and can be implemented for similar brownfields.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
综合资产建模方法在西伯利亚西部某大油田油藏管理中的应用
本文回顾了LUKOIL-West Siberia LLC的一个大型油田的数字孪生模型的开发和实施。项目团队开发了一个油田开发后期的综合资产模型(IAM),用于制定管理决策以及工程和技术服务的运营工作。IAM包括水库的简化模型,井和收集系统的模型,以及工厂的简化模型。由此产生的模型可以产生关于生产水平的短期假设(长达1年),并且具有高度可持续性,本文中给出的关于IAM在各种生产任务中的应用的示例证实了这一点。开发的自动化工具可以快速做出决策,优化井库作业,并揭示井下泵送设备和计量设施的工艺参数偏差。IAM工具的使用使生产部门能够完成许多与预测油井运行模式和评估油田现有生产能力相关的应用任务。本文提出的案例为资产在其活动中应用环境管理提供了良好的实践,并可用于类似的棕地。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Successful Application of Managed Pressure Drilling and Cementing in Naturally Fractured Carbonates Environment of Prohorovskoe Exploration Well The Use of Induction Heating in Assessing the Technical Condition and Operating Intervals in Producing Wells A 3-Step Reaction Model For Numerical Simulation of In-Situ Combustion An Example of Building a Petrophysical Model of Unconsolidated Gas-Saturated Laminated Sediments Using Advanced Wireline and Logging While Drilling Services New method for Handling of Infrastructural Constraints for Integrated Modeling in Steady Case
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1