{"title":"Automated determination of Top Level Control Signals","authors":"R. Jain, Praveen Tiwari, Soumen Ghosh","doi":"10.7873/DATE.2013.115","DOIUrl":null,"url":null,"abstract":"During various stages of hardware design, different types of control signals get introduced; clock, reset are specified and connected at the RTL stage whereas signals like scan enable, isolation enable, power switch enable get added to implemented devices later in the flow.","PeriodicalId":6310,"journal":{"name":"2013 Design, Automation & Test in Europe Conference & Exhibition (DATE)","volume":"92 1","pages":"509-512"},"PeriodicalIF":0.0000,"publicationDate":"2013-03-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 Design, Automation & Test in Europe Conference & Exhibition (DATE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.7873/DATE.2013.115","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
During various stages of hardware design, different types of control signals get introduced; clock, reset are specified and connected at the RTL stage whereas signals like scan enable, isolation enable, power switch enable get added to implemented devices later in the flow.