Controlling of fast-track construction method variables (time, cost, and quality)

IF 1.9 Q3 MANAGEMENT Infrastructure Asset Management Pub Date : 2023-04-28 DOI:10.1680/jinam.23.00001
M. El-Far, M. Kotb, R. Sabry
{"title":"Controlling of fast-track construction method variables (time, cost, and quality)","authors":"M. El-Far, M. Kotb, R. Sabry","doi":"10.1680/jinam.23.00001","DOIUrl":null,"url":null,"abstract":"Fast-track construction projects that begin with inadequate design information have become more common in response to rising construction industry demand. Fast-tracking shortens project duration while increasing rework. To achieve project deadlines while minimizing rework, specialists must select the best fast-tracking strategy. As a result, a questionnaire was developed to assess the success characteristics of fast-track construction and to provide constraints for these features and variables in national construction projects. National construction projects address specified government needs or investments in order to maximize the national return. The surveys limit these factors by specifying maximum and minimum percentages. These percentages were chosen in order to expedite project building. Period varies in national projects from the typical construction approach to the shortest time we can achieve with a plan. Cost and quality are within 20% and 10% of national project traditional construction methods, respectively. The best setting for various construction projects is determined by this proportion. It is preferable to use these percentages as a reference to complete construction projects in the shortest amount of time, with the highest quality, and at the lowest cost. This questionnaire was completed by sixteen building experts. Google Forms questionnaire was completed by 211 persons. This clarifies the results and construction variables time, cost, and quality.","PeriodicalId":43387,"journal":{"name":"Infrastructure Asset Management","volume":"42 1","pages":""},"PeriodicalIF":1.9000,"publicationDate":"2023-04-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Infrastructure Asset Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jinam.23.00001","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 1

Abstract

Fast-track construction projects that begin with inadequate design information have become more common in response to rising construction industry demand. Fast-tracking shortens project duration while increasing rework. To achieve project deadlines while minimizing rework, specialists must select the best fast-tracking strategy. As a result, a questionnaire was developed to assess the success characteristics of fast-track construction and to provide constraints for these features and variables in national construction projects. National construction projects address specified government needs or investments in order to maximize the national return. The surveys limit these factors by specifying maximum and minimum percentages. These percentages were chosen in order to expedite project building. Period varies in national projects from the typical construction approach to the shortest time we can achieve with a plan. Cost and quality are within 20% and 10% of national project traditional construction methods, respectively. The best setting for various construction projects is determined by this proportion. It is preferable to use these percentages as a reference to complete construction projects in the shortest amount of time, with the highest quality, and at the lowest cost. This questionnaire was completed by sixteen building experts. Google Forms questionnaire was completed by 211 persons. This clarifies the results and construction variables time, cost, and quality.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
快速施工方法变量(时间、成本、质量)的控制
为了应对不断增长的建筑行业需求,从设计信息不足开始的快速建设项目变得越来越普遍。快速跟踪缩短了项目持续时间,同时增加了返工。为了在最小化返工的同时达到项目的最后期限,专家们必须选择最佳的快速跟踪策略。因此,开发了一份调查问卷,以评估快速通道建设的成功特征,并为国家建设项目中的这些特征和变量提供约束。国家建设项目是为了满足特定的政府需求或投资,以实现国家回报的最大化。调查通过指定最大和最小百分比来限制这些因素。选择这些百分比是为了加快项目建设。国家工程的工期各不相同,既有典型的施工方式,也有规划的最短工期。成本和质量分别在国家工程传统施工方法的20%和10%以内。各种建设项目的最佳设置就是由这个比例决定的。最好使用这些百分比作为参考,以便在最短的时间内以最高的质量和最低的成本完成建设项目。这份问卷由16位建筑专家完成。211人完成了Google Forms问卷调查。这澄清了结果和施工变量时间、成本和质量。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
2.70
自引率
14.30%
发文量
18
期刊最新文献
Exploration of the impact of junction characteristics on pedestrian red light violation Viability rubric of FRP composites for civil infrastructure applications Automated early estimation of bridge interventions, possession windows and costs Multi-objective optimization of building planning energy saving based on genetic algorithm Evaluating the impact of flexible offices in coping with the uncertainty on future demand
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1