Mario Buffardo, E. Scione, Catalano Toni Fabio, Carlani Daniele, Ruà Emanuele Giovanni
{"title":"Implementation of double insulation at satellite level: an approach","authors":"Mario Buffardo, E. Scione, Catalano Toni Fabio, Carlani Daniele, Ruà Emanuele Giovanni","doi":"10.1109/ESPC.2019.8932082","DOIUrl":null,"url":null,"abstract":"The double insulation topic has become a very important issue in the satellite design since its implementation drives the sizing of the whole satellite electrical architecture. Different approaches and solutions have been proposed by Industry [2], according to specific need of each spacecraft design and requirements. According to ECSS-E-ST-20C [1]., a barrier against short circuit between conductors or circuit elements shall be guaranteed also after any credible single failure. In particular., the guideline is that all non-protected elements of a main bus distribution system shall implement an electrical double insulation up to the first protection device (e.g.: fuse., current breaker or current limiter).","PeriodicalId":6734,"journal":{"name":"2019 European Space Power Conference (ESPC)","volume":"20 1","pages":"1-5"},"PeriodicalIF":0.0000,"publicationDate":"2019-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 European Space Power Conference (ESPC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ESPC.2019.8932082","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
The double insulation topic has become a very important issue in the satellite design since its implementation drives the sizing of the whole satellite electrical architecture. Different approaches and solutions have been proposed by Industry [2], according to specific need of each spacecraft design and requirements. According to ECSS-E-ST-20C [1]., a barrier against short circuit between conductors or circuit elements shall be guaranteed also after any credible single failure. In particular., the guideline is that all non-protected elements of a main bus distribution system shall implement an electrical double insulation up to the first protection device (e.g.: fuse., current breaker or current limiter).