Analysis of Development Planning of Own Use Gas Pipeline from Gas Compressor Stations to Gathering Stations in X Field

Muhammad Ariyon, Muhammad Setriya Ramadhan
{"title":"Analysis of Development Planning of Own Use Gas Pipeline from Gas Compressor Stations to Gathering Stations in X Field","authors":"Muhammad Ariyon, Muhammad Setriya Ramadhan","doi":"10.24191/jsst.v3i1.45","DOIUrl":null,"url":null,"abstract":"Trunkline gas network system from Gas Compressor Station (GCS) B to GS.B -GS.B5 total distance of ±18 km. Distance GS.B4-GS.B5 is 9400 m. Gas is the main fuel for engines at gathering stations. A deadlock was found on the GS.B4–GS.B5 pipeline. The solution to this problem is to plan a pipeline between GS.B4–GS.B5 for optimal gas supply. This study conducts an economic analysis of the planning of pipe construction with the same trunkline diameter. Selection of diameter by looking at the effect of pressure drop and erosional velocity using the Pipesim. Then take a problem solving approach by building a system using a pig launcher. Based on the research results, in the existing conditions with a distance of 9400 m using a diameter of 6 and 4 inches there is a high pressure drop. Scenario planning minimizes pressure drop by using equal diameter pipes between 4,6 and 8 inches. The analysis results show that the selected diameter is 6 inches. Pig launcher is designed with safe specs and design. Calculation of the project's economic indicators with an investment of 505,911 US$ M and an oil price of 62.38 US$/bbl. Calculation results obtained NPV @12%= 6,022 US$M, IRR= 495%, POT= 0.19 years, PI= 12.90. Sensitivity analysis by changing assumptions 85%, 115% of the basic assumptions, showed the lowest NPV= 4,725 US$M, the lowest IRR= 393%. Based on the results, this project is profitable and feasible to be developed from an economic perspective.","PeriodicalId":17117,"journal":{"name":"Journal of Smart Science and Technology","volume":"23 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-03-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Smart Science and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24191/jsst.v3i1.45","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Trunkline gas network system from Gas Compressor Station (GCS) B to GS.B -GS.B5 total distance of ±18 km. Distance GS.B4-GS.B5 is 9400 m. Gas is the main fuel for engines at gathering stations. A deadlock was found on the GS.B4–GS.B5 pipeline. The solution to this problem is to plan a pipeline between GS.B4–GS.B5 for optimal gas supply. This study conducts an economic analysis of the planning of pipe construction with the same trunkline diameter. Selection of diameter by looking at the effect of pressure drop and erosional velocity using the Pipesim. Then take a problem solving approach by building a system using a pig launcher. Based on the research results, in the existing conditions with a distance of 9400 m using a diameter of 6 and 4 inches there is a high pressure drop. Scenario planning minimizes pressure drop by using equal diameter pipes between 4,6 and 8 inches. The analysis results show that the selected diameter is 6 inches. Pig launcher is designed with safe specs and design. Calculation of the project's economic indicators with an investment of 505,911 US$ M and an oil price of 62.38 US$/bbl. Calculation results obtained NPV @12%= 6,022 US$M, IRR= 495%, POT= 0.19 years, PI= 12.90. Sensitivity analysis by changing assumptions 85%, 115% of the basic assumptions, showed the lowest NPV= 4,725 US$M, the lowest IRR= 393%. Based on the results, this project is profitable and feasible to be developed from an economic perspective.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
X油田自用燃气压缩站至集输站管道发展规划分析
燃气压缩站(GCS) B到GS的干线燃气网络系统。B - gs。B5总距离±18公里。距离GS.B4-GS。B5是9400米。汽油是加油站发动机的主要燃料。在GS.B4-GS上发现死锁。B5管道。解决这个问题的方法是在GS.B4-GS之间规划一条管道。B5为最佳供气。本文对相同干线直径的管道施工规划进行了经济分析。通过观察压降和侵蚀速度对管径的影响来选择管径。然后采取解决问题的方法,使用清管器发射器构建系统。根据研究结果,在现有条件下,使用直径为6和4英寸的距离为9400 m时,存在较大的压降。通过使用4英寸、6英寸和8英寸之间的等径管道,在方案规划中最大限度地减少压降。分析结果表明,所选直径为6英寸。猪式发射装置采用安全规格和设计。项目投资505,911万美元,油价62.38美元/桶的经济指标计算。计算结果得到NPV @12%= 6022 US$M, IRR= 495%, POT= 0.19年,PI= 12.90。敏感性分析通过改变85%的假设,115%的基本假设,最低NPV= 4,725美元,最低IRR= 393%。从经济角度看,该项目具有一定的经济效益和开发可行性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Clinical Efficacy of Autogenous Vertebrae-Filled PEEK Cage in Anterior Cervical Discectomy and Fusion with Instrumentation Simulation of a Pumped Stormwater System and Evaluation of the Solar Potential for Pumping Effects of Cellulolytic Fungi and Biofertilizer Doses on the Growth and Yield of Tomato (Solanum lycopersicum L.) in Alluvial Soil Analysis of Development Planning of Own Use Gas Pipeline from Gas Compressor Stations to Gathering Stations in X Field Exploring Bipartite Network Approach in Hand, Foot and Mouth Disease Hotspot Identification
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1