{"title":"Delivering a new helicopter base at Kai Tak for the Hong Kong Government Flying Service","authors":"George Mak, Jeffrey Lo, Rom Lam","doi":"10.1680/jcien.22.00117","DOIUrl":null,"url":null,"abstract":"An additional helicopter base has been built for Government Flying Service at the former Kai Tak airport runway site in Hong Kong. The base allows high-rise development to take place at Tung Chung new town near the service’s existing base at Hong Kong International airport, which would have restricted emergency helicopter operations during poor weather. The project involved construction of a take-off and landing pad, parking bays and hangar for two helicopters, plus an office building for the flight planning centre and air command and control centre. This paper describes how use of an NEC contract helped ensure close collaboration between the employer and contractor, leading to timely completion with zero accidents despite restrictions caused by the Covid-19 pandemic.","PeriodicalId":54573,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Civil Engineering","volume":"37 1","pages":""},"PeriodicalIF":0.4000,"publicationDate":"2022-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Civil Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1680/jcien.22.00117","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 1
Abstract
An additional helicopter base has been built for Government Flying Service at the former Kai Tak airport runway site in Hong Kong. The base allows high-rise development to take place at Tung Chung new town near the service’s existing base at Hong Kong International airport, which would have restricted emergency helicopter operations during poor weather. The project involved construction of a take-off and landing pad, parking bays and hangar for two helicopters, plus an office building for the flight planning centre and air command and control centre. This paper describes how use of an NEC contract helped ensure close collaboration between the employer and contractor, leading to timely completion with zero accidents despite restrictions caused by the Covid-19 pandemic.
期刊介绍:
Civil Engineering, listed by the Web of Science, is the ICE''s flagship journal. Practical and diverse in its scope, it publishes overview papers for the non-specialist on any subject relevant to civil engineering today. Topics range from landmark projects to philosophical, ethical, environmental, management and safety issues.
Peer review, copyediting, and colour publication by Civil Engineering are free. If accepted, published papers are easily found by Google search, as well as in specialist citation indexes. There is also the option of making your article open access, should you wish to.
Published authors receive a free electronic copy of their article to share with their peers. Furthermore, as well exposure to ICE''s 91,000-strong membership, published papers are promoted via our social media channels, accessing the wider civil engineering community.
It is free to submit a paper to this journal. Papers appear Ahead of Print (below) as soon as they are ready to be published. Ahead of print articles are fully citable. using the DOI system