Uphill excavation of an escalator barrel between operational underground platforms

IF 0.4 4区 工程技术 Q4 ENGINEERING, CIVIL Proceedings of the Institution of Civil Engineers-Civil Engineering Pub Date : 2022-07-18 DOI:10.1680/jcien.22.00042
Sebastian Kumpfmueller, A. Nasekhian, P. Dryden
{"title":"Uphill excavation of an escalator barrel between operational underground platforms","authors":"Sebastian Kumpfmueller, A. Nasekhian, P. Dryden","doi":"10.1680/jcien.22.00042","DOIUrl":null,"url":null,"abstract":"A new underground triple escalator has been provided at Bank Station in London as part of a major capacity upgrade project. Unusually the inclined excavator tunnel was excavated uphill rather than downhill due restricted access. Using a sprayed concrete lining and no pilot tunnel, it was a first in the UK for a triple escalator. The new escalator intercepted several existing structures which had to be backfilled and then broken out, some just 0.5 m from operational Tube lines. This paper sets out design considerations, construction sequence decisions, operational risk management and discusses the existing assets’ response to uphill tunnelling based on a comprehensive monitoring scheme.","PeriodicalId":54573,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Civil Engineering","volume":"25 1","pages":""},"PeriodicalIF":0.4000,"publicationDate":"2022-07-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Civil Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1680/jcien.22.00042","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 1

Abstract

A new underground triple escalator has been provided at Bank Station in London as part of a major capacity upgrade project. Unusually the inclined excavator tunnel was excavated uphill rather than downhill due restricted access. Using a sprayed concrete lining and no pilot tunnel, it was a first in the UK for a triple escalator. The new escalator intercepted several existing structures which had to be backfilled and then broken out, some just 0.5 m from operational Tube lines. This paper sets out design considerations, construction sequence decisions, operational risk management and discusses the existing assets’ response to uphill tunnelling based on a comprehensive monitoring scheme.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
在运行的地下平台之间进行上坡开挖自动扶梯筒
伦敦银行站安装了新的地下三层自动扶梯,这是一项重大容量升级项目的一部分。不同寻常的是,由于通道受限,倾斜的挖掘机隧道是上山而不是下坡开挖的。使用喷射混凝土衬里,没有先导隧道,这是英国第一个三层自动扶梯。新的自动扶梯拦截了几个现有的结构,这些结构必须进行回填,然后再进行拆除,其中一些距离运营的地铁线只有0.5米。本文阐述了设计考虑、施工顺序决策、操作风险管理,并在综合监测方案的基础上讨论了现有资产对上坡隧道施工的反应。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
1.60
自引率
25.00%
发文量
68
审稿时长
>12 weeks
期刊介绍: Civil Engineering, listed by the Web of Science, is the ICE''s flagship journal. Practical and diverse in its scope, it publishes overview papers for the non-specialist on any subject relevant to civil engineering today. Topics range from landmark projects to philosophical, ethical, environmental, management and safety issues. Peer review, copyediting, and colour publication by Civil Engineering are free. If accepted, published papers are easily found by Google search, as well as in specialist citation indexes. There is also the option of making your article open access, should you wish to. Published authors receive a free electronic copy of their article to share with their peers. Furthermore, as well exposure to ICE''s 91,000-strong membership, published papers are promoted via our social media channels, accessing the wider civil engineering community. It is free to submit a paper to this journal. Papers appear Ahead of Print (below) as soon as they are ready to be published. Ahead of print articles are fully citable. using the DOI system
期刊最新文献
HS2: delivering a climate change adapted and resilient railway Infrastructure resilience under a changing climate: the urgent need for engineers to act Briefing: Tried-and-tested guidance for helping governments deliver the infrastructure people need Briefing: Groundwater flooding – a hidden hazard Briefing: The future of goods movement: envisioning net zero logistics
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1