Algorithm of reactive power dispatching "per generator" realization on TPP Nikola Tesla A

J. Pavlović, Bojan Radojičić, Lazar Stančić, J. Dragosavac, Sava Dobričić, Ž. Janda
{"title":"Algorithm of reactive power dispatching \"per generator\" realization on TPP Nikola Tesla A","authors":"J. Pavlović, Bojan Radojičić, Lazar Stančić, J. Dragosavac, Sava Dobričić, Ž. Janda","doi":"10.5937/zeint32-41760","DOIUrl":null,"url":null,"abstract":"The algorithm of reactive power dispatching \"per generator\" realization is presented in the paper. Dispatching \"per generator\" and \"per grid\" are two modes of reactive power dispatching used by coordinated reactive power and voltage regulator (GRRS). Reactive power dispatching \"per generator\" ensures equal heating of the generators, while dispatching \"per grid\" ensures maximal reactive power reserve when generated reactive power either increases, or decreases. Reactive power dispatching \"per generator\" is more complex for realization because the dispatching criterion may have wider generator's reactive power operation area than the working capability curve. In these cases, the additional limiting of the generator reactive power is necessary, while other generators take over the remaining reactive power, still considering the reactive power dispatching criteria \"per generator\" and the limits of the remaining generators. Both reactive power dispatching modes are presented in two examples, while operating near and far from the limit area. Eventually, as the verification of the algorithm and its realization, the operating results of GRRS while dispatching \"per generator\" is active, are presented.","PeriodicalId":31629,"journal":{"name":"Zbornik Radova Elektrotehnicki Institut Nikola Tesla","volume":"107 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Zbornik Radova Elektrotehnicki Institut Nikola Tesla","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5937/zeint32-41760","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The algorithm of reactive power dispatching "per generator" realization is presented in the paper. Dispatching "per generator" and "per grid" are two modes of reactive power dispatching used by coordinated reactive power and voltage regulator (GRRS). Reactive power dispatching "per generator" ensures equal heating of the generators, while dispatching "per grid" ensures maximal reactive power reserve when generated reactive power either increases, or decreases. Reactive power dispatching "per generator" is more complex for realization because the dispatching criterion may have wider generator's reactive power operation area than the working capability curve. In these cases, the additional limiting of the generator reactive power is necessary, while other generators take over the remaining reactive power, still considering the reactive power dispatching criteria "per generator" and the limits of the remaining generators. Both reactive power dispatching modes are presented in two examples, while operating near and far from the limit area. Eventually, as the verification of the algorithm and its realization, the operating results of GRRS while dispatching "per generator" is active, are presented.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
TPP上“每台发电机”无功调度实现算法
本文提出了“每台发电机”无功调度的实现算法。“每台发电机”调度和“每网”调度是GRRS采用的两种无功调度模式。“每台发电机组”无功调度保证了发电机组的等量供热,“每网”调度保证了发电无功增加或减少时的最大无功储备。由于“每台发电机”的无功功率调度准则可能比工作能力曲线具有更宽的发电机无功运行区域,因此实现起来更为复杂。在这种情况下,发电机无功功率的附加限制是必要的,而其他发电机接管剩余的无功功率,仍然考虑“每台发电机”的无功功率调度标准和剩余发电机的限制。给出了两种无功调度模式,分别在靠近和远离限制区的情况下运行。最后,作为算法的验证和实现,给出了GRRS在“每台发电机”主动调度时的运行结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
90
审稿时长
4 weeks
期刊最新文献
Computer model analysis of dynamic performances of the excitation control system when the load angle limiter is active Insulation stresses of power equipment exposed to non-standard overvoltage waveforms Application of the environmentally friendly technology for the removal of PCBs from mineral oils and power transformers to achieve very low values of PCBs for repair and materials recycling The reliability of serial data communication using Uart-Usb converter Calculation of protection function settings of new elements of the 500 kV transmission system
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1