Clair Phase 1: The Evolving Development of a Complex Fractured Field

M. Webster
{"title":"Clair Phase 1: The Evolving Development of a Complex Fractured Field","authors":"M. Webster","doi":"10.2118/193242-MS","DOIUrl":null,"url":null,"abstract":"\n The Clair field is the largest discovered oilfield on the UK continental shelf (UKCS) but has high reservoir uncertainty associated with a complex natural fracture network. The field area covers over 200 sq km with an estimated STOIIP of 7 billion barrels. The scale and complexity of the reservoir has led to a phased multi-platform development.\n Phase 1 started production in 2005 with 20 wells drilled prior to an extended drill break. Five new wells (A21 to A25) were drilled and brought online during 2016/17 which increased platform production by c.70%. The new wells incorporated historic lessons to mitigate the risk of wellbore instability in the overburden and be robust to the dynamic uncertainties of the fractured reservoir. Many of the well outcomes and risk events were predicted and mitigated effectively, however the new wells still provided some surprises.\n This paper presents a summary of the lessons from the historic Clair development wells which underpinned the recent drilling campaign and additional field understanding provided by the new well results. New insights include a narrower overburden drilling window and zonal isolation challenges within the reservoir.","PeriodicalId":11014,"journal":{"name":"Day 1 Mon, November 12, 2018","volume":"60 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Mon, November 12, 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/193242-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The Clair field is the largest discovered oilfield on the UK continental shelf (UKCS) but has high reservoir uncertainty associated with a complex natural fracture network. The field area covers over 200 sq km with an estimated STOIIP of 7 billion barrels. The scale and complexity of the reservoir has led to a phased multi-platform development. Phase 1 started production in 2005 with 20 wells drilled prior to an extended drill break. Five new wells (A21 to A25) were drilled and brought online during 2016/17 which increased platform production by c.70%. The new wells incorporated historic lessons to mitigate the risk of wellbore instability in the overburden and be robust to the dynamic uncertainties of the fractured reservoir. Many of the well outcomes and risk events were predicted and mitigated effectively, however the new wells still provided some surprises. This paper presents a summary of the lessons from the historic Clair development wells which underpinned the recent drilling campaign and additional field understanding provided by the new well results. New insights include a narrower overburden drilling window and zonal isolation challenges within the reservoir.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Clair阶段1:复杂裂缝油田的不断发展
克莱尔油田是英国大陆架(UKCS)上发现的最大油田,但由于复杂的天然裂缝网络,储层的不确定性很高。该油田面积超过200平方公里,估计STOIIP为70亿桶。储层的规模和复杂性导致了分阶段的多平台开发。第一阶段于2005年开始生产,在延长钻井休息之前,共钻了20口井。2016/17年度,5口新井(A21至A25)投产,使平台产量增加了约70%。新井吸取了历史经验教训,降低了覆盖层井筒不稳定的风险,并对裂缝性油藏的动态不确定性具有较强的稳健性。许多井的结果和风险事件都得到了有效的预测和缓解,但新井仍然提供了一些惊喜。本文总结了Clair开发井的经验教训,这些井为最近的钻井活动提供了基础,并通过新井的结果提供了额外的现场了解。新的见解包括更窄的覆盖层钻井窗口和油藏内的层间隔离挑战。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Does the kappa number method accurately reflect lignin content in nonwood pulps? Using multistage models to evaluate how pulp washing after the first extraction stage impacts elemental chlorine-free bleach demand Understanding the risks and rewards of using 50% vs. 10% strength peroxide in pulp bleach plants Understanding the pulping and bleaching performances of eucalyptus woods affected by physiological disturbance Measurements of the Inorganic Scale Buildup Rate on Downhole Completion Equipment – Debris Barrier Screens
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1