Study on Time Overrun related to Construction Projects in Sri Lanka

Q3 Engineering Advances in Technology Innovation Pub Date : 2022-05-15 DOI:10.31357/ait.v2i2.5501
Yathupriyan Arulvel, S. Widisinghe
{"title":"Study on Time Overrun related to Construction Projects in Sri Lanka","authors":"Yathupriyan Arulvel, S. Widisinghe","doi":"10.31357/ait.v2i2.5501","DOIUrl":null,"url":null,"abstract":"The time overrun in construction projects is a common issue around the world and no exception in Sri Lankan construction industry. The aims are to identify the causes and their significance to the project time overrun as well as to provide suggestions for those identified causes. Totally 39 significant factors were identified as relevant to Sri Lankan construction industry through a literature survey. Then a quantitative questionnaire approach was conducted to identify the significance of factors from industry professionals (civil engineers, quantity surveyors, technical officers, supervisors & directors, and the persons with minimum qualification and experience in the construction industry) working as stakeholders such as clients, consultants, and contractors without considering the project type. The previously identified 39 factors were found to be applicable to the Sri Lankan construction industry with survey results. Through the survey, 33 responses were collected and analyzed based on the relative important index of the results. Highly weighted 15 project time overrun factors were analyzed in detail. Mainly, three factors of time overrun in construction projects were identified by ranking based on overall responses; i) contractor’s improper planning, ii) mistakes during construction by contractors, and iii) delay in preparation and approval of drawings. At the same time, social and cultural factors and disputes with surroundings or neighbours got the least significance based on ranking. The relationship between the significance of factors and relevance to the construction party (contractor, consultant) is also identified in this study. From questionnaire responses, the political influence, material theft, labor attitudes and motivation, and unexpected material cost increase than the total budget was selected for the further discussion. Finally, recommendations are provided for future development projects such as the contractor’s proper planning. As well as experienced and well knowledge professional to be appointed as a project manager by contracting firm.","PeriodicalId":52314,"journal":{"name":"Advances in Technology Innovation","volume":"2 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-05-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Advances in Technology Innovation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31357/ait.v2i2.5501","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

Abstract

The time overrun in construction projects is a common issue around the world and no exception in Sri Lankan construction industry. The aims are to identify the causes and their significance to the project time overrun as well as to provide suggestions for those identified causes. Totally 39 significant factors were identified as relevant to Sri Lankan construction industry through a literature survey. Then a quantitative questionnaire approach was conducted to identify the significance of factors from industry professionals (civil engineers, quantity surveyors, technical officers, supervisors & directors, and the persons with minimum qualification and experience in the construction industry) working as stakeholders such as clients, consultants, and contractors without considering the project type. The previously identified 39 factors were found to be applicable to the Sri Lankan construction industry with survey results. Through the survey, 33 responses were collected and analyzed based on the relative important index of the results. Highly weighted 15 project time overrun factors were analyzed in detail. Mainly, three factors of time overrun in construction projects were identified by ranking based on overall responses; i) contractor’s improper planning, ii) mistakes during construction by contractors, and iii) delay in preparation and approval of drawings. At the same time, social and cultural factors and disputes with surroundings or neighbours got the least significance based on ranking. The relationship between the significance of factors and relevance to the construction party (contractor, consultant) is also identified in this study. From questionnaire responses, the political influence, material theft, labor attitudes and motivation, and unexpected material cost increase than the total budget was selected for the further discussion. Finally, recommendations are provided for future development projects such as the contractor’s proper planning. As well as experienced and well knowledge professional to be appointed as a project manager by contracting firm.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
斯里兰卡建设项目工期超限问题研究
建设项目工期超期是世界各国普遍存在的问题,斯里兰卡建筑业也不例外。目的是确定项目时间超期的原因及其重要性,并为这些确定的原因提供建议。通过文献调查,共确定了39个与斯里兰卡建筑业相关的显著因素。然后进行了定量问卷调查方法,以确定行业专业人士(土木工程师,工料测量师,技术人员,主管和董事,以及在建筑行业具有最低资格和经验的人员)作为利益相关者(如客户,顾问和承包商)工作的因素的重要性,而不考虑项目类型。通过调查结果发现,先前确定的39个因素适用于斯里兰卡建筑业。通过调查,收集了33个反馈,并根据结果的相对重要指标进行了分析。详细分析了权重较高的15个项目超期因素。主要通过对项目总体反应的排序,找出影响建设项目超期的三个因素;1)承包商的规划不当;2)承包商施工过程中的失误;3)图纸的编制和审批延迟。与此同时,社会和文化因素以及与周围或邻居的纠纷在排名中最不重要。本研究也确定了各因素的显著性与建设方(承包商、顾问)的相关性之间的关系。从问卷的回答中,我们选择了政治影响、材料盗窃、劳工态度和动机、意外的材料成本增加超过总预算来进行进一步的讨论。最后,对未来的开发项目提出了建议,如承包商的合理规划。以及经验丰富、知识渊博的专业人士,由承包公司任命为项目经理。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
Advances in Technology Innovation
Advances in Technology Innovation Energy-Energy Engineering and Power Technology
CiteScore
1.90
自引率
0.00%
发文量
18
审稿时长
12 weeks
期刊最新文献
Synthesis and Characterization of Phase Change Microcapsules Containing Nano-Graphite Challenges and Solutions to Criminal Liability for the Actions of Robots and AI Selection of Elevation Models for Flood Inundation Map Generation in Small Urban Stream: Case Study of Anyang Stream Efficient Object Detection and Intelligent Information Display Using YOLOv4-Tiny The Prediction of Low-Rise Building Construction Cost Estimation Using Extreme Learning Machine
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1