Prevention of the flow of clays located higher than productive formation outside and necking of production string

E. Mammadov
{"title":"Prevention of the flow of clays located higher than productive formation outside and necking of production string","authors":"E. Mammadov","doi":"10.37474/0365-8554/2022-12-18-21","DOIUrl":null,"url":null,"abstract":"The paper studies the methods of prevention of necking of casings and in particular, production strings, as well as the complications occurring in the drilling process in the Caspian Sea as a result of clay flowing out and prediction of such kind of issues. Moreover, in the selection of production strings, “Stress Check” software program was used. One of the geological issues leading to the necking of casing is probably poorly cemented clay layers. In addition, the structure of the well drilled in Bulla-deniz field, formation pressure and the selection of casing for this well have been considered. In conclusion, the selection of casing to be lowered into the gas well in Bulla-deniz field has been executed via “Stress Check“ software program.","PeriodicalId":8668,"journal":{"name":"Azerbaijan Oil Industry","volume":"57 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-12-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Azerbaijan Oil Industry","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37474/0365-8554/2022-12-18-21","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The paper studies the methods of prevention of necking of casings and in particular, production strings, as well as the complications occurring in the drilling process in the Caspian Sea as a result of clay flowing out and prediction of such kind of issues. Moreover, in the selection of production strings, “Stress Check” software program was used. One of the geological issues leading to the necking of casing is probably poorly cemented clay layers. In addition, the structure of the well drilled in Bulla-deniz field, formation pressure and the selection of casing for this well have been considered. In conclusion, the selection of casing to be lowered into the gas well in Bulla-deniz field has been executed via “Stress Check“ software program.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
防止生产管柱外部和颈部高于生产地层的粘土流动
本文研究了防止套管特别是生产管柱缩颈的方法,以及在里海钻井过程中由于粘土外溢而引起的复杂问题和此类问题的预测。此外,在生产管柱的选择中,使用了“应力检查”软件程序。导致套管颈缩的地质问题之一可能是胶结不良的粘土层。此外,还考虑了Bulla-deniz油田所钻井的结构、地层压力和套管的选择。综上所述,通过“应力校核”软件程序对Bulla-deniz气田下入气井的套管进行了选择。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Increasing performance efficiency of reconstructed oil fields Research of the lithofacies properties of the Productive series rocks in the north-west flank Bulla-Project field Study of the influence of non-carbon gases on the condensate recovery coefficient of gas condensate fields using a hydrodynamic model Investigation into restoration of waterflooding process in the Darvin bankasi field Formation products from the n-undecane oxidation reaction
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1