BIM for airport Facility Management (FM): The case of a US International Airport

IF 1.9 Q3 MANAGEMENT Infrastructure Asset Management Pub Date : 2023-03-02 DOI:10.1680/jinam.22.00019
Kofi A. B. Asare, R. Liu, C. Anumba
{"title":"BIM for airport Facility Management (FM): The case of a US International Airport","authors":"Kofi A. B. Asare, R. Liu, C. Anumba","doi":"10.1680/jinam.22.00019","DOIUrl":null,"url":null,"abstract":"Facilities Management (FM) at airports involves the use of systems such as Computerized Maintenance Management Systems (CMMS). Currently, the integration of BIM with CMMS is yet to reach maturity, resulting in the inability to reuse BIM data produced prior to the operations and maintenance phase. The lack of accurate and untimely handover of equipment data contributes to failed CMMS programs. The studied airport had a low CMMS utilization resulting from a lack of equipment data from recent and old construction projects and lacked an efficient process for acquiring, storing, and exchanging asset data from construction into its CMMS. To address this, the airport sought for solutions to reuse BIM data in the CMMS. Utilizing a Design Science Research (DSR) methodology, this research proposed and tested a solution technology innovation comprising a BIM-FM integration framework and structured workflow based on BIM and COBie for FM data delivery into a CMMS. The proposed solution was tested on a real-world project at the airport: showing efficacy to provide the required equipment data in a timely and accurate manner as compared to the existing practice. The study provides practical evidence of application of BIM and COBie in FM data delivery from a handover perspective.","PeriodicalId":43387,"journal":{"name":"Infrastructure Asset Management","volume":"37 1","pages":""},"PeriodicalIF":1.9000,"publicationDate":"2023-03-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Infrastructure Asset Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jinam.22.00019","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 0

Abstract

Facilities Management (FM) at airports involves the use of systems such as Computerized Maintenance Management Systems (CMMS). Currently, the integration of BIM with CMMS is yet to reach maturity, resulting in the inability to reuse BIM data produced prior to the operations and maintenance phase. The lack of accurate and untimely handover of equipment data contributes to failed CMMS programs. The studied airport had a low CMMS utilization resulting from a lack of equipment data from recent and old construction projects and lacked an efficient process for acquiring, storing, and exchanging asset data from construction into its CMMS. To address this, the airport sought for solutions to reuse BIM data in the CMMS. Utilizing a Design Science Research (DSR) methodology, this research proposed and tested a solution technology innovation comprising a BIM-FM integration framework and structured workflow based on BIM and COBie for FM data delivery into a CMMS. The proposed solution was tested on a real-world project at the airport: showing efficacy to provide the required equipment data in a timely and accurate manner as compared to the existing practice. The study provides practical evidence of application of BIM and COBie in FM data delivery from a handover perspective.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
BIM用于机场设施管理(FM):以美国国际机场为例
机场设施管理(FM)涉及计算机化维修管理系统(CMMS)等系统的使用。目前,BIM与CMMS的集成尚未成熟,导致运维阶段之前产生的BIM数据无法重用。缺乏准确和不及时的设备数据移交是导致CMMS项目失败的原因。由于缺乏来自近期和旧建设项目的设备数据,以及缺乏从建设中获取、存储和交换资产数据到其CMMS的有效流程,所研究的机场的CMMS利用率较低。为了解决这个问题,机场寻求在CMMS中重用BIM数据的解决方案。利用设计科学研究(DSR)方法,本研究提出并测试了一种解决方案技术创新,包括BIM-FM集成框架和基于BIM和COBie的结构化工作流,用于将FM数据交付到CMMS中。建议的解决方案在机场的实际项目中进行了测试:与现有做法相比,显示出及时准确地提供所需设备数据的功效。本研究从交接的角度为BIM和COBie在FM数据传递中的应用提供了实践证据。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
CiteScore
2.70
自引率
14.30%
发文量
18
期刊最新文献
Exploration of the impact of junction characteristics on pedestrian red light violation Viability rubric of FRP composites for civil infrastructure applications Automated early estimation of bridge interventions, possession windows and costs Multi-objective optimization of building planning energy saving based on genetic algorithm Evaluating the impact of flexible offices in coping with the uncertainty on future demand
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1