Design and Development of Centralized Air Conditioning Plant Model with Water Cooled Chiller

J. Yadav, Syed Zaheer Abba, N. Kumar, K. V. Babu, V. Kiran, V. A. Kumar
{"title":"Design and Development of Centralized Air Conditioning Plant Model with Water Cooled Chiller","authors":"J. Yadav, Syed Zaheer Abba, N. Kumar, K. V. Babu, V. Kiran, V. A. Kumar","doi":"10.37591/JORACHV.V7I3.1054","DOIUrl":null,"url":null,"abstract":"The work consists of how a proposed centralized air conditioning is designed and its criterion for a new building in college. Central Air Conditioners working is a complex and cumbersome topic which takes a lot of time and effort. It’s a difficult task to explain the entire parts, its working and maintenance. Here an effort is made to explain about the designing of Ducts used in a central A/C. A commercial building is taken for reference and each floor’s Duct designing is explained. It consists of three floors. The main objective is to create a thermally controlled environment within the space of a building envelope such as office space. The tentative air conditioning load for the system shall be 1.5 TR approx. Water-cooled chillers with secondary variable pumping system are proposed to make the system energy efficient. The duct design was started and using the duct sizer version 6.4 we calculated the optimum duct sizes required for the 3 floors. The duct dimensions for accurate flow of air volume to maintain the interior environment of the building in an optimal state is found. The design of air-conditioning includes heat load estimation, selection of Chillers, Pumps, Air Handling Units (AHU) based upon design, the model will be fabricated. Based on the design we fabricated the ducts through which the thermally cooled environment is developed. Results of this work included the design of accurate dimensions required for a building, Volume flow rate of air flowing in each room, Fabrication of the ducts and final prototype of a working water-cooled chiller was created.","PeriodicalId":91841,"journal":{"name":"ASHRAE winter conference papers. American Society of Heating, Refrigeration and Air-Conditioning Engineers","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-02-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ASHRAE winter conference papers. American Society of Heating, Refrigeration and Air-Conditioning Engineers","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37591/JORACHV.V7I3.1054","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The work consists of how a proposed centralized air conditioning is designed and its criterion for a new building in college. Central Air Conditioners working is a complex and cumbersome topic which takes a lot of time and effort. It’s a difficult task to explain the entire parts, its working and maintenance. Here an effort is made to explain about the designing of Ducts used in a central A/C. A commercial building is taken for reference and each floor’s Duct designing is explained. It consists of three floors. The main objective is to create a thermally controlled environment within the space of a building envelope such as office space. The tentative air conditioning load for the system shall be 1.5 TR approx. Water-cooled chillers with secondary variable pumping system are proposed to make the system energy efficient. The duct design was started and using the duct sizer version 6.4 we calculated the optimum duct sizes required for the 3 floors. The duct dimensions for accurate flow of air volume to maintain the interior environment of the building in an optimal state is found. The design of air-conditioning includes heat load estimation, selection of Chillers, Pumps, Air Handling Units (AHU) based upon design, the model will be fabricated. Based on the design we fabricated the ducts through which the thermally cooled environment is developed. Results of this work included the design of accurate dimensions required for a building, Volume flow rate of air flowing in each room, Fabrication of the ducts and final prototype of a working water-cooled chiller was created.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
水冷式中央空调机组模型的设计与开发
这项工作包括如何为一所大学的新建筑设计一个集中式空调及其标准。中央空调的工作是一个复杂而繁琐的话题,需要花费大量的时间和精力。要解释整个部件及其工作和维护是一项艰巨的任务。本文对中央空调风管的设计进行了阐述。以某商业建筑为例,介绍了各层风管的设计。它由三层楼组成。主要目标是在建筑围护结构空间(如办公空间)内创造一个热控制的环境。系统的空调负荷暂定约为1.5 TR。为了提高系统的节能效果,提出了采用二次变量泵送系统的水冷式冷水机组。风管设计开始,使用6.4版本的风管尺寸,我们计算了3层所需的最佳风管尺寸。找到了精确风量流量的风管尺寸,以保持建筑物内部环境处于最佳状态。空调的设计包括热负荷估算、制冷机、水泵的选型、空调机组(AHU)的选型,在设计的基础上制作模型。在此基础上,我们制作了热冷却环境形成的管道。这项工作的结果包括设计建筑物所需的精确尺寸,每个房间的空气流量,管道的制造和工作水冷式冷水机的最终原型。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A Review on Thermodynamic Analysis of thermal Heat Dissipating Fins A Review on the Performance of the Phase Change Material on the Solar Energy Collector Devices Experimental Investigation on Performance of Vapor Compression Refrigeration System using Nanorefrigerant (R134a+Al2O3) with/without Evaporative Condenser Design and Development of Centralized Air Conditioning Plant Model with Water Cooled Chiller Solar Stirling Power Generation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1