S. Ramakrishnan, Shiladitya Chakravorty, Jensen Tay, David Olsen, Peter Zumpano
{"title":"Staggering Preventive Maintenance Actions at CMP Using a Dispatching Algorithm","authors":"S. Ramakrishnan, Shiladitya Chakravorty, Jensen Tay, David Olsen, Peter Zumpano","doi":"10.1109/ASMC49169.2020.9185225","DOIUrl":null,"url":null,"abstract":"In a semiconductor fab, distributing wafers equally across a toolset (set of tools that perform similar operations) helps achieve a higher throughput as opposed to loading them unevenly. However, in some processing steps, level loading tools leads to uniform usage of consumables (material used up at a tool in processing wafers) and can trigger simultaneous Preventive Maintenance (PM) actions to replenish them. Managing simultaneous PMs with a small maintenance team reduces tool availability while using a bigger workforce entails higher costs. This study presents ways to overcome this situation by staggering PM actions across tools","PeriodicalId":6771,"journal":{"name":"2020 31st Annual SEMI Advanced Semiconductor Manufacturing Conference (ASMC)","volume":"8 1","pages":"1-6"},"PeriodicalIF":0.0000,"publicationDate":"2020-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 31st Annual SEMI Advanced Semiconductor Manufacturing Conference (ASMC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ASMC49169.2020.9185225","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
In a semiconductor fab, distributing wafers equally across a toolset (set of tools that perform similar operations) helps achieve a higher throughput as opposed to loading them unevenly. However, in some processing steps, level loading tools leads to uniform usage of consumables (material used up at a tool in processing wafers) and can trigger simultaneous Preventive Maintenance (PM) actions to replenish them. Managing simultaneous PMs with a small maintenance team reduces tool availability while using a bigger workforce entails higher costs. This study presents ways to overcome this situation by staggering PM actions across tools