Well Design Evolution, Validation and Optimization in ADNOC Onshore GAS Field

A. Yugay, A. Gadelhak, G. Pimenta, Mariam Mansoor Al Reyami
{"title":"Well Design Evolution, Validation and Optimization in ADNOC Onshore GAS Field","authors":"A. Yugay, A. Gadelhak, G. Pimenta, Mariam Mansoor Al Reyami","doi":"10.2118/192836-MS","DOIUrl":null,"url":null,"abstract":"\n In early 80's in ADNOC Onshore standard well completion design for gas producers in Reservoir Y of Bab field was a combination of L-80 carbon steel with a downhole continuous corrosion inhibitor injection above the Chemical Injection Valve (CIV) and Corrosion Resistant Alloy (CRA) Incoloy 825 / SM25Cr-75 below the CIV and packer.\n In 1994 (after 10 years of operation), due to the fact that no integrity issues were observed, it was decided to maintain the same design strategy was followed in all new gas producer wells in this reservoir. Identical design strategy was followed for Reservoir X (Project-I) gas wells which presented less severe fluid conditions. Table 1 summarizes reservoir conditions for both reservoir X and Y.","PeriodicalId":11014,"journal":{"name":"Day 1 Mon, November 12, 2018","volume":"35 42","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Mon, November 12, 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/192836-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In early 80's in ADNOC Onshore standard well completion design for gas producers in Reservoir Y of Bab field was a combination of L-80 carbon steel with a downhole continuous corrosion inhibitor injection above the Chemical Injection Valve (CIV) and Corrosion Resistant Alloy (CRA) Incoloy 825 / SM25Cr-75 below the CIV and packer. In 1994 (after 10 years of operation), due to the fact that no integrity issues were observed, it was decided to maintain the same design strategy was followed in all new gas producer wells in this reservoir. Identical design strategy was followed for Reservoir X (Project-I) gas wells which presented less severe fluid conditions. Table 1 summarizes reservoir conditions for both reservoir X and Y.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
ADNOC陆上气田井设计演变、验证与优化
上世纪80年代初,ADNOC为Bab油田Y油藏的天然气生产商设计的陆上标准完井设计是L-80碳钢与化学注入阀(CIV)上方的井下连续注入缓蚀剂,以及CIV和封隔器下方的耐腐蚀合金(CRA) incoly 825 / SM25Cr-75的组合。1994年(经过10年的运营),由于没有发现完整性问题,因此决定在该油藏的所有新产气井中保持相同的设计策略。X油藏(Project-I)的气井采用了相同的设计策略,但流体条件不那么恶劣。表1总结了X层和Y层的储层条件。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Does the kappa number method accurately reflect lignin content in nonwood pulps? Using multistage models to evaluate how pulp washing after the first extraction stage impacts elemental chlorine-free bleach demand Understanding the risks and rewards of using 50% vs. 10% strength peroxide in pulp bleach plants Understanding the pulping and bleaching performances of eucalyptus woods affected by physiological disturbance Measurements of the Inorganic Scale Buildup Rate on Downhole Completion Equipment – Debris Barrier Screens
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1