数据趋势预测的统计信息分析

A. Sherstneva, O. Sherstneva
{"title":"数据趋势预测的统计信息分析","authors":"A. Sherstneva, O. Sherstneva","doi":"10.1109/UralCon49858.2020.9216276","DOIUrl":null,"url":null,"abstract":"The article considers organizational principles of the reporting and management system. The indicators are classified by two areas, service level and profitability. Based on these indicators, a conclusion is drawn about the system's productivity. The range of statistics needed to evaluate performance is defined. The relationship between observed statistical indicators and estimated ones is performed. A comparison between observed and estimated waiting times in different groups is shown in graphical form. The detailed processing of the selected process segments is given. In terms of opportunities the article prompts to choose approach for implementation the activity. The article aims to propose an algorithm implementation, estimate performance indicators and data trend forecasting.","PeriodicalId":230353,"journal":{"name":"2020 International Ural Conference on Electrical Power Engineering (UralCon)","volume":"32 8-9","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis of Statistical Information for Data Trend Forecasting\",\"authors\":\"A. Sherstneva, O. Sherstneva\",\"doi\":\"10.1109/UralCon49858.2020.9216276\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The article considers organizational principles of the reporting and management system. The indicators are classified by two areas, service level and profitability. Based on these indicators, a conclusion is drawn about the system's productivity. The range of statistics needed to evaluate performance is defined. The relationship between observed statistical indicators and estimated ones is performed. A comparison between observed and estimated waiting times in different groups is shown in graphical form. The detailed processing of the selected process segments is given. In terms of opportunities the article prompts to choose approach for implementation the activity. The article aims to propose an algorithm implementation, estimate performance indicators and data trend forecasting.\",\"PeriodicalId\":230353,\"journal\":{\"name\":\"2020 International Ural Conference on Electrical Power Engineering (UralCon)\",\"volume\":\"32 8-9\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 International Ural Conference on Electrical Power Engineering (UralCon)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/UralCon49858.2020.9216276\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 International Ural Conference on Electrical Power Engineering (UralCon)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/UralCon49858.2020.9216276","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文考虑了报告和管理体系的组织原则。这些指标分为两个方面:服务水平和盈利能力。根据这些指标,得出了系统生产率的结论。定义了评估性能所需的统计范围。将观测到的统计指标与估计的统计指标进行关系分析。不同组中观察到的和估计的等待时间之间的比较以图形形式显示。给出了所选工艺段的具体处理过程。在机会方面,文章提示选择实施活动的方法。本文旨在提出一种算法实现,估计性能指标和数据趋势预测。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Analysis of Statistical Information for Data Trend Forecasting
The article considers organizational principles of the reporting and management system. The indicators are classified by two areas, service level and profitability. Based on these indicators, a conclusion is drawn about the system's productivity. The range of statistics needed to evaluate performance is defined. The relationship between observed statistical indicators and estimated ones is performed. A comparison between observed and estimated waiting times in different groups is shown in graphical form. The detailed processing of the selected process segments is given. In terms of opportunities the article prompts to choose approach for implementation the activity. The article aims to propose an algorithm implementation, estimate performance indicators and data trend forecasting.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Analysis of Statistical Information for Data Trend Forecasting Analysis of Power Oscillations Parameters in Autonomous Electrical Complexes Using the Method of Customization Charts Designing System for Cleaning the Surface of Solar Modules from Dust Pollution Analysis of Power Quality and Pumping Units Operation's Optimization Device for Data Communication along Power Lines
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1