{"title":"动态环境下的多智能体准时制制造调度系统","authors":"Y. Jiang, W. Weng, S. Fujimura","doi":"10.1109/IIAI-AAI.2016.44","DOIUrl":null,"url":null,"abstract":"This article proposes a novel method to solve the manufacturing scheduling problems in multi-agent system (MAS) for dynamic environment. The study focuses on the machine selection work for jobs and proposes a remaining time prediction method, which will help a job choose machines based on estimated finishing time. In this way, we can keep the job finishing just-in-time, which aims to support a customer-oriented lead time policy, and can provide better manufacturing performance and increase customer service level. This article provides experimental results compared with another approach in previous research, through which we can find that in some case if we put the Just-in-time philosophy into consideration, the proposed method will deliver competitive performance.","PeriodicalId":272739,"journal":{"name":"2016 5th IIAI International Congress on Advanced Applied Informatics (IIAI-AAI)","volume":"44 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Multi-agent Just-in-Time Manufacturing Scheduling System for Dynamic Environment\",\"authors\":\"Y. Jiang, W. Weng, S. Fujimura\",\"doi\":\"10.1109/IIAI-AAI.2016.44\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This article proposes a novel method to solve the manufacturing scheduling problems in multi-agent system (MAS) for dynamic environment. The study focuses on the machine selection work for jobs and proposes a remaining time prediction method, which will help a job choose machines based on estimated finishing time. In this way, we can keep the job finishing just-in-time, which aims to support a customer-oriented lead time policy, and can provide better manufacturing performance and increase customer service level. This article provides experimental results compared with another approach in previous research, through which we can find that in some case if we put the Just-in-time philosophy into consideration, the proposed method will deliver competitive performance.\",\"PeriodicalId\":272739,\"journal\":{\"name\":\"2016 5th IIAI International Congress on Advanced Applied Informatics (IIAI-AAI)\",\"volume\":\"44 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 5th IIAI International Congress on Advanced Applied Informatics (IIAI-AAI)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IIAI-AAI.2016.44\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 5th IIAI International Congress on Advanced Applied Informatics (IIAI-AAI)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IIAI-AAI.2016.44","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Multi-agent Just-in-Time Manufacturing Scheduling System for Dynamic Environment
This article proposes a novel method to solve the manufacturing scheduling problems in multi-agent system (MAS) for dynamic environment. The study focuses on the machine selection work for jobs and proposes a remaining time prediction method, which will help a job choose machines based on estimated finishing time. In this way, we can keep the job finishing just-in-time, which aims to support a customer-oriented lead time policy, and can provide better manufacturing performance and increase customer service level. This article provides experimental results compared with another approach in previous research, through which we can find that in some case if we put the Just-in-time philosophy into consideration, the proposed method will deliver competitive performance.