{"title":"多目标炼钢-连铸调度的混合元启发式算法","authors":"S. Yuan, Tieke Li, B. Wang","doi":"10.1109/ISCID.2017.21","DOIUrl":null,"url":null,"abstract":"Aiming at the special process requirements of steelmaking-continuous casting (SCC) scheduling, a constraint satisfaction model is established with the objectives of the total waiting time, idle time of the machines, and the earliness and tardiness time of the casts. Furthermore, an NSGA-MOPSO algorithm with the adaptive grid selection strategy (AGSS) is proposed, which effectively overcome the problem of easily losing the useful information that use traditional Pareto domination method. Finally, experiments and compared algorithm are set up and the results show that the feasibility and effectiveness of the proposed NSGA-MOPSO algorithm","PeriodicalId":294370,"journal":{"name":"International Symposium on Computational Intelligence and Design","volume":"412 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Hybrid Metaheuristic for Multi-objective Steelmaking-Continuous Casting Scheduling\",\"authors\":\"S. Yuan, Tieke Li, B. Wang\",\"doi\":\"10.1109/ISCID.2017.21\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Aiming at the special process requirements of steelmaking-continuous casting (SCC) scheduling, a constraint satisfaction model is established with the objectives of the total waiting time, idle time of the machines, and the earliness and tardiness time of the casts. Furthermore, an NSGA-MOPSO algorithm with the adaptive grid selection strategy (AGSS) is proposed, which effectively overcome the problem of easily losing the useful information that use traditional Pareto domination method. Finally, experiments and compared algorithm are set up and the results show that the feasibility and effectiveness of the proposed NSGA-MOPSO algorithm\",\"PeriodicalId\":294370,\"journal\":{\"name\":\"International Symposium on Computational Intelligence and Design\",\"volume\":\"412 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Symposium on Computational Intelligence and Design\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISCID.2017.21\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Symposium on Computational Intelligence and Design","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISCID.2017.21","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Hybrid Metaheuristic for Multi-objective Steelmaking-Continuous Casting Scheduling
Aiming at the special process requirements of steelmaking-continuous casting (SCC) scheduling, a constraint satisfaction model is established with the objectives of the total waiting time, idle time of the machines, and the earliness and tardiness time of the casts. Furthermore, an NSGA-MOPSO algorithm with the adaptive grid selection strategy (AGSS) is proposed, which effectively overcome the problem of easily losing the useful information that use traditional Pareto domination method. Finally, experiments and compared algorithm are set up and the results show that the feasibility and effectiveness of the proposed NSGA-MOPSO algorithm