V. Machado, Paulo Afonso Parreira Júnior, H. Costa
{"title":"软件项目管理中的风险目录","authors":"V. Machado, Paulo Afonso Parreira Júnior, H. Costa","doi":"10.1109/CLEI47609.2019.9089044","DOIUrl":null,"url":null,"abstract":"The software industry is continuously growing, and projects need to be planned to have a better chance of success. But, planning errors in a project can cause the project to fail. These errors, when there is damage/loss or gain, are called risks and need to be managed. Inadequate risk management can lead to project failure. Therefore, risk management in software design is crucial to its success. In this paper, through research in the literature, catalogs of risks that may occur during the development of software projects are presented. Besides, there are measures defined/identified in the literature to support decision making by project managers, using the GQM method.","PeriodicalId":216193,"journal":{"name":"2019 XLV Latin American Computing Conference (CLEI)","volume":"53 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Risk Catalogs in Software Project Management\",\"authors\":\"V. Machado, Paulo Afonso Parreira Júnior, H. Costa\",\"doi\":\"10.1109/CLEI47609.2019.9089044\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The software industry is continuously growing, and projects need to be planned to have a better chance of success. But, planning errors in a project can cause the project to fail. These errors, when there is damage/loss or gain, are called risks and need to be managed. Inadequate risk management can lead to project failure. Therefore, risk management in software design is crucial to its success. In this paper, through research in the literature, catalogs of risks that may occur during the development of software projects are presented. Besides, there are measures defined/identified in the literature to support decision making by project managers, using the GQM method.\",\"PeriodicalId\":216193,\"journal\":{\"name\":\"2019 XLV Latin American Computing Conference (CLEI)\",\"volume\":\"53 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 XLV Latin American Computing Conference (CLEI)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CLEI47609.2019.9089044\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 XLV Latin American Computing Conference (CLEI)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CLEI47609.2019.9089044","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The software industry is continuously growing, and projects need to be planned to have a better chance of success. But, planning errors in a project can cause the project to fail. These errors, when there is damage/loss or gain, are called risks and need to be managed. Inadequate risk management can lead to project failure. Therefore, risk management in software design is crucial to its success. In this paper, through research in the literature, catalogs of risks that may occur during the development of software projects are presented. Besides, there are measures defined/identified in the literature to support decision making by project managers, using the GQM method.