500kV变电站供电区主变扩容方案评价方法

Gaocai Yang, Xiaofan Su, Yuzheng Xie, Pingjiang Lu, Fula Hou
{"title":"500kV变电站供电区主变扩容方案评价方法","authors":"Gaocai Yang, Xiaofan Su, Yuzheng Xie, Pingjiang Lu, Fula Hou","doi":"10.1109/ITNEC56291.2023.10082241","DOIUrl":null,"url":null,"abstract":"With the development of the national economy, the power system load is increasing, and the capacity of the generator and the main transformer of the substation is also growing. It is necessary to increase the transformer capacity in the substation power supply area to ensure the power supply capacity of the substation. Based on the short-circuit calculation of the 500kV substation and the N-1 failure analysis of the main transformer, the security margin of the 500kV transformer load rate and the security index of short-circuit current of 220kV bus in the 500kV substation are proposed. Then the limit transmission capacity security margin of 220kV transmission lines in the power supply area and the standard deviation of the grid load of the 500kV main transformer after the expansion scheme adopted is calculated. The main transformer reorganization and expansion schemes are assessed comprehensively and objectively from the above four aspects. Finally, the effectiveness and adaptability of the proposed method are verified by a provincial power grid.","PeriodicalId":218770,"journal":{"name":"2023 IEEE 6th Information Technology,Networking,Electronic and Automation Control Conference (ITNEC)","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-02-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Evaluation Method of Main Transformer Capacity Expansion Scheme in Power Supply Area of 500kV Substation\",\"authors\":\"Gaocai Yang, Xiaofan Su, Yuzheng Xie, Pingjiang Lu, Fula Hou\",\"doi\":\"10.1109/ITNEC56291.2023.10082241\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"With the development of the national economy, the power system load is increasing, and the capacity of the generator and the main transformer of the substation is also growing. It is necessary to increase the transformer capacity in the substation power supply area to ensure the power supply capacity of the substation. Based on the short-circuit calculation of the 500kV substation and the N-1 failure analysis of the main transformer, the security margin of the 500kV transformer load rate and the security index of short-circuit current of 220kV bus in the 500kV substation are proposed. Then the limit transmission capacity security margin of 220kV transmission lines in the power supply area and the standard deviation of the grid load of the 500kV main transformer after the expansion scheme adopted is calculated. The main transformer reorganization and expansion schemes are assessed comprehensively and objectively from the above four aspects. Finally, the effectiveness and adaptability of the proposed method are verified by a provincial power grid.\",\"PeriodicalId\":218770,\"journal\":{\"name\":\"2023 IEEE 6th Information Technology,Networking,Electronic and Automation Control Conference (ITNEC)\",\"volume\":\"9 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-02-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2023 IEEE 6th Information Technology,Networking,Electronic and Automation Control Conference (ITNEC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ITNEC56291.2023.10082241\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2023 IEEE 6th Information Technology,Networking,Electronic and Automation Control Conference (ITNEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ITNEC56291.2023.10082241","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

随着国民经济的发展,电力系统负荷越来越大,变电站发电机和主变的容量也越来越大。有必要在变电站供电区增加变压器容量,以保证变电站的供电能力。在500kV变电站短路计算和主变压器N-1失效分析的基础上,提出500kV变压器负载量安全裕度和500kV变电站220kV母线短路电流安全指标。然后计算采用扩容方案后供电区220kV输电线路的极限输电容量安全裕度和500kV主变电网负荷的标准差。从以上四个方面对主变改扩建方案进行了全面、客观的评价。最后,以某省级电网为例,验证了该方法的有效性和适应性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Evaluation Method of Main Transformer Capacity Expansion Scheme in Power Supply Area of 500kV Substation
With the development of the national economy, the power system load is increasing, and the capacity of the generator and the main transformer of the substation is also growing. It is necessary to increase the transformer capacity in the substation power supply area to ensure the power supply capacity of the substation. Based on the short-circuit calculation of the 500kV substation and the N-1 failure analysis of the main transformer, the security margin of the 500kV transformer load rate and the security index of short-circuit current of 220kV bus in the 500kV substation are proposed. Then the limit transmission capacity security margin of 220kV transmission lines in the power supply area and the standard deviation of the grid load of the 500kV main transformer after the expansion scheme adopted is calculated. The main transformer reorganization and expansion schemes are assessed comprehensively and objectively from the above four aspects. Finally, the effectiveness and adaptability of the proposed method are verified by a provincial power grid.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Research on deterministic service quality guarantee for 5G network slice in power grid A wearable, real-time sEMG gesture classifier based on E-tattoo and CDF-CNN for prosthetic control Development of online monitoring system for cylinder pressure of marine low-speed engine based on virtual instrument An Improved Prediction Method of Transformer Oil Temperature Ranging Model and Algorithm Based on Monocular Vision for Autonomous Driving
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1